Call for public inputs on a proposed JCM project (Myanmar) “Introduction of Energy Efficient Refrigeration System in Logistics Center” (5 November to 4 December 2020) |
Myanmar |
05 Nov 20 |
Call for public comments on proposed JCM projects (Indonesia) "Energy Saving for Industrial Park with Smart LED Street Lighting System" (5 November to 4 December 2020) |
Indonesia |
05 Nov 20 |
Electronic Decision by the JC |
Maldives |
29 Oct 20 |
Call for public inputs on JCM proposed methodologies "Introduction of cascade cooling system and temperature stratification tank at the beer factory" and "Introduction of heat recovery system and high efficiency once-through boiler at the beer factory" (Myanmar) (2 to 16 October 2020) |
Myanmar |
02 Oct 20 |
Electronic Decision by the JC |
Thailand |
28 Sep 20 |
Electronic Decision by the JC |
Indonesia |
17 Sep 20 |
Call for public comments on JCM proposed methodology “Introduction of CNG-Diesel Hybrid Equipment to Public Buses” (Indonesia) (14 to 28 September 2020) |
Indonesia |
14 Sep 20 |
Call for public inputs on JCM proposed methodology and proposed revisions to the approved methodology CL_AM001 (Chile) (10 to 24 September 2020) |
Chile |
10 Sep 20 |
Call for public comments on JCM proposed methodology “Installation of all-electric injection molding machine with power regeneration” (Indonesia) (3 to 17 September 2020) |
Indonesia |
03 Sep 20 |
Call for public inputs on a JCM proposed methodology "Installation of Energy Management System and Battery Energy Storage System (EMS-BESS) with Solar PV System" (Maldives) (9 to 23 July 2020) |
Maldives |
09 Jul 20 |
Electronic Decision by the JC |
Cambodia |
27 Jun 20 |
Call for public comments on JCM proposed methodologies (Thailand) (19 June to 3 July 2020) |
Thailand |
19 Jun 20 |
Call for public comments on proposed revisions to the approved methodology TH_AM001 (Thailand) (21 May to 4 June 2020) |
Thailand |
21 May 20 |
Call for public comments on JCM proposed methodologies “Installation of gas engine cogeneration system with absorption chiller to supply electricity, heating energy and cooling energy” and "Replacement of diffuser with aerator in aeration pond" (Indonesia) (12 to 26 May 2020) |
Indonesia |
12 May 20 |
Electronic Decision by the JC |
Myanmar |
20 Apr 20 |
Electronic Decision by the JC |
Indonesia |
30 Mar 20 |
Electronic Decision by the JC |
Thailand |
27 Mar 20 |
3rd Joint Committee in Riyadh |
Saudi Arabia |
05 Mar 20 |
Electronic Decision by the JC |
Costa Rica |
23 Feb 20 |
5th Joint Committee in Phnom Penh |
Cambodia |
21 Feb 20 |