Electronic Decision by the JC |
Indonesia |
17 Sep 20 |
Call for public comments on JCM proposed methodology “Introduction of CNG-Diesel Hybrid Equipment to Public Buses” (Indonesia) (14 to 28 September 2020) |
Indonesia |
14 Sep 20 |
Call for public inputs on JCM proposed methodology and proposed revisions to the approved methodology CL_AM001 (Chile) (10 to 24 September 2020) |
Chile |
10 Sep 20 |
Call for public comments on JCM proposed methodology “Installation of all-electric injection molding machine with power regeneration” (Indonesia) (3 to 17 September 2020) |
Indonesia |
03 Sep 20 |
Call for public inputs on a JCM proposed methodology "Installation of Energy Management System and Battery Energy Storage System (EMS-BESS) with Solar PV System" (Maldives) (9 to 23 July 2020) |
Maldives |
09 Jul 20 |
Electronic Decision by the JC |
Cambodia |
27 Jun 20 |
Call for public comments on JCM proposed methodologies (Thailand) (19 June to 3 July 2020) |
Thailand |
19 Jun 20 |
Call for public comments on proposed revisions to the approved methodology TH_AM001 (Thailand) (21 May to 4 June 2020) |
Thailand |
21 May 20 |
Call for public comments on JCM proposed methodologies “Installation of gas engine cogeneration system with absorption chiller to supply electricity, heating energy and cooling energy” and "Replacement of diffuser with aerator in aeration pond" (Indonesia) (12 to 26 May 2020) |
Indonesia |
12 May 20 |
Electronic Decision by the JC |
Myanmar |
20 Apr 20 |
Electronic Decision by the JC |
Indonesia |
30 Mar 20 |
Electronic Decision by the JC |
Thailand |
27 Mar 20 |
3rd Joint Committee in Riyadh |
Saudi Arabia |
05 Mar 20 |
Electronic Decision by the JC |
Costa Rica |
23 Feb 20 |
5th Joint Committee in Phnom Penh |
Cambodia |
21 Feb 20 |
Call for public comments on a proposed JCM project (Thailand) "Introduction of 5MW Floating Solar Power System on Industrial Water Reservoir in Thailand" (20 February to 20 March 2020) |
Thailand |
20 Feb 20 |
Call for public comments on JCM proposed methodologies (Thailand) (18 February to 3 March 2020) |
Thailand |
18 Feb 20 |
Call for public inputs on a proposed JCM project (Costa Rica) “Introduction of High Efficiency Centrifugal Chiller and Electric Heat Pump Type Water Heater in Hotel” (14 February to 14 March 2020) |
Costa Rica |
14 Feb 20 |
Call for public inputs on a proposed JCM project (Viet Nam) “Installation of High Efficiency Kiln in Sanitary Ware Manufacturing Factory” (4 February to 4 March 2020) |
Viet Nam |
04 Feb 20 |
Electronic Decision by the JC |
Philippines |
02 Feb 20 |