ID024 |
Indonesia |
Introduction of Absorption Chiller to Chemical Factory |
Project registered |
30 Mar 20 |
592 |
ID023 |
Indonesia |
Installation of Solar Power System and Storage Battery to Commercial Facility |
Project registered |
17 Feb 21 |
260 |
ID022 |
Indonesia |
Introduction of High Efficiency Once-through Boiler in Golf Ball Factory |
Project registered |
03 Sep 19 |
131 |
ID021 |
Indonesia |
Introduction of High-efficiency Once-through Boiler in Film Factory |
Project registered |
31 Oct 19 |
738 |
ID020 |
Indonesia |
Introduction of High-Efficiency Looms in Weaving Mill |
Project registered |
03 Sep 19 |
376 |
ID019 |
Indonesia |
Installation of gas engine cogeneration system to supply electricity and heat to the vehicle manufacturing factory of PT. Toyota Motor Manufacturing Indonesia |
Project registered |
09 May 19 |
19,613 |
ID018 |
Indonesia |
1.6MW Solar PV Power Plant Project in Jakabaring Sport City |
Project registered |
07 Mar 19 |
899 |
ID017 |
Indonesia |
Introduction of 0.5MW Solar Power System to Aroma and Food Ingredients Factory |
Project registered |
07 Mar 19 |
369 |
ID016 |
Indonesia |
Installation of Tribrid System to mobile communication’s Base Transceiver Stations in Republic of Indonesia |
Project registered |
10 Jul 18 |
359 |
ID015 |
Indonesia |
Reducing GHG emission at textile factories by upgrading to air-saving loom |
Project registered |
24 Aug 18 |
742 |
ID014 |
Indonesia |
Energy saving by optimum operation at an oil refinery |
Project registered |
10 Jul 18 |
1,275 |
VN014 |
Viet Nam |
Introduction of high-efficient wire stranding machines to the factory of YAZAKI EDS VIETNAM Co., LTD. |
Project registered |
28 May 19 |
426 |
TH014 |
Thailand |
Introduction of 5MW Floating Solar Power System on Industrial Water Reservoir in Thailand |
Project registered |
28 Sep 20 |
2,539 |
ID013 |
Indonesia |
Power generation by waste heat recovery in the PT Semen Indonesia (Persero) Tbk factory in Tuban |
Project registered |
10 Jul 18 |
132,500 |
TH013 |
Thailand |
Installation of Co-Generation Plant for On-Site Energy Supply and High Efficiency Non-Inverter Type Centrifugal Chiller in Motorcycle Factory |
Project registered |
17 Jun 22 |
7,122 |
VN013 |
Viet Nam |
Introduction of Amorphous High Efficiency Transformers in Northern, Central and Southern Power Grids |
Project registered |
28 May 19 |
3,477 |
VN012 |
Viet Nam |
Introduction of High Efficiency Water Pumps in Da Nang City |
Project registered |
28 May 19 |
599 |
ID012 |
Indonesia |
GHG emission reductions through utility facility operation optimization system for refineries in the Republic of Indonesia |
Project registered |
10 Jul 18 |
20,000 |
VN011 |
Viet Nam |
Installation of Energy Saving Equipment in Lens Factory |
Project registered |
28 May 19 |
927 |
ID011 |
Indonesia |
Reduction of Energy Consumption by Introducing an Energy-Efficient Waste Paper Processing System into a Packaging Paper Factory in Bekasi, West Java |
Project registered |
22 Dec 17 |
17,822 |
VN010 |
Viet Nam |
Installation of Container Formation Facility at Lead Acid Battery Factory of Hitachi Chemical Energy Technology (Vietnam) Co., Ltd. |
Project registered |
28 May 19 |
3,506 |
ID010 |
Indonesia |
Energy saving through introduction of Regenerative Burners for aluminum holding furnaces of the automotive components manufacture in the Republic of Indonesia |
Project registered |
30 Mar 20 |
78 |
VN009 |
Viet Nam |
Introduction of Energy-Efficient Air Conditioners in RICOH IMAGING PRODUCTS (Vietnam) CO., LTD |
Project registered |
15 Aug 18 |
112 |
TH009 |
Thailand |
Introduction of 30MW Rooftop Solar Power System to Large Supermarkets |
Project registered |
27 Mar 20 |
12,699 |
ID009 |
Indonesia |
Energy Saving for Air-Conditioning at Shopping Mall with High Efficiency Centrifugal Chiller |
Project registered |
04 Dec 17 |
325 |
VN008 |
Viet Nam |
Introduction of Amorphous High Efficiency Transformers in Southern and Central Power Grids |
Project registered |
15 Aug 18 |
3,533 |
ID008 |
Indonesia |
Introducing double-bundle modular electric heat pumps at AXIA SOUTH CIKARANG Tower 2 |
Project registered |
10 Feb 17 |
166 |
TH008 |
Thailand |
Introduction of Heat Recovery Heat Pumps to a Chicken Slaughtering Plant in Thailand |
Project registered |
20 Sep 21 |
942 |
TH007 |
Thailand |
Energy Saving for Air conditioning in Tire Manufacturing Factory with High Efficiency Centrifugal Chiller |
Project registered |
17 Jun 22 |
173 |
VN007 |
Viet Nam |
Introduction of Solar PV System at shopping mall in Ho Chi Minh |
Project registered |
15 Aug 18 |
112 |
TH006 |
Thailand |
Power Generation by Waste Heat Recovery in Cement Industry |
Project registered |
02 Aug 19 |
29,206 |
VN006 |
Viet Nam |
Energy saving and work efficiency improvement by introducing a new chip-on-board LED system in Vietnam |
Project registered |
15 Aug 18 |
823 |
ID006 |
Indonesia |
Installation of Inverter-type Air Conditioning System, LED Lighting and Separate Type Fridge Freezer Showcase to Grocery Stores in Republic of Indonesia |
Project registered |
03 Jun 16 |
115 |
MN006 |
Mongolia |
Introduction of 15MW Solar Power System near New Airport |
Project registered |
02 Jun 23 |
17,577 |
VN005 |
Viet Nam |
Introduction of High Efficiency Air-conditioning in Hotel |
Project registered |
10 Oct 17 |
792 |
TH005 |
Thailand |
Introduction of 3.4MW Rooftop Solar Power System to Air-conditioning Parts Factories |
Project registered |
14 Jan 19 |
1,071 |
ID005 |
Indonesia |
Energy Saving for Air-Conditioning at Textile Factory by Introducing High-efficiency Centrifugal Chiller in Batang, Central Java (Phase 2) |
Project registered |
24 Mar 16 |
145 |
MN005 |
Mongolia |
A HIGH EFFICIENCY AND LOW LOSS POWER TRANSMISSION AND DISTRIBUTION SYSTEM IN MONGOLIA |
Project registered |
16 Nov 17 |
467 |
KH005 |
Cambodia |
Prey Lang Wildlife Sanctuary - Stung Treng REDD+ project |
Project registered |
09 Jun 23 |
345,770 |
LA004 |
Laos |
Introduction of Amorphous High Efficiency Transformers in Power Grid |
Project registered |
24 May 23 |
2,109 |
MN004 |
Mongolia |
10MW Solar Power Project in Darkhan City |
Project registered |
26 May 17 |
11,221 |
KH004 |
Cambodia |
Energy Saving by Inverters for Distribution Pumps in Water Treatment Plant |
Project registered |
09 Jun 23 |
413 |
ID004 |
Indonesia |
Energy Saving for Air-Conditioning at Textile Factory by Introducing High-efficiency Centrifugal Chiller in Karawang West Java |
Project registered |
24 Mar 16 |
176 |
PH004 |
Philippines |
Introduction of 1MW Rooftop Solar Power System in Vehicle Assembly Factory |
Project registered |
09 Apr 23 |
607 |
VN004 |
Viet Nam |
Introduction of amorphous high efficiency transformers in power distribution systems in the southern part of Viet Nam |
Project registered |
15 May 16 |
610 |
BD004 |
Bangladesh |
Introduction of PV-diesel Hybrid System at Fastening Manufacturing Plant |
Project registered |
04 Apr 19 |
203 |
TH004 |
Thailand |
Energy Saving for Semiconductor Factory with High Efficiency Centrifugal Chiller and Compressor |
Project registered |
20 Apr 18 |
324 |
PW004 |
Palau |
Introduction of 0.4MW Rooftop Solar Power System in Supermarket and Hotel |
Project registered |
11 Jul 21 |
259 |
CL003 |
Chile |
3MW Solar Power Project Utilizing Farmland in Valparaiso Region |
Project registered |
17 Aug 24 |
2,128 |
TH003 |
Thailand |
Installation of High Efficiency Air Conditioning System and Chillers in Semiconductor Factory |
Project registered |
20 Apr 18 |
3,327 |
MN003 |
Mongolia |
Installation of 12.7 MW Solar Power Plant for Power Supply In Ulaanbaatar Suburb |
Project registered |
26 May 17 |
11,223 |
VN003 |
Viet Nam |
Low carbon hotel project in Vietnam: Improving the energy efficiency of commercial buildings by utilization of high efficiency equipment |
Project registered |
15 May 16 |
272 |
PH003 |
Philippines |
Installation of 1.2MW Rooftop Solar Power System in Freezing Warehouse |
Project registered |
04 Nov 21 |
793 |
ID003 |
Indonesia |
Project of Introducing High Efficiency Refrigerator to a Frozen Food Processing Plant in Indonesia |
Project registered |
29 Mar 15 |
21 |
PW003 |
Palau |
Small Scale Solar Power Plants for Commercial Facilities in Island States II |
Project registered |
12 Jul 16 |
315 |
BD003 |
Bangladesh |
Installation of High Efficiency Loom at Weaving Factory |
Project registered |
04 Apr 19 |
382 |
LA003 |
Laos |
Introduction of 11MW Solar Power Project in Savannakhet Province |
Project registered |
22 Jun 22 |
4,795 |
PW002 |
Palau |
Small Scale Solar Power Plants for Schools in Island States |
Project registered |
12 Jul 16 |
108 |
MN002 |
Mongolia |
Centralization of heat supply system by installation of high-efficiency Heat Only Boilers in Bornuur soum Project |
Project registered |
30 Jun 15 |
206 |
TH002 |
Thailand |
Reducing GHG emission at Textile Factory of Luckytex (Thailand) Public Company Limited by Upgrading to Air-saving Loom |
Project registered |
20 Apr 18 |
253 |
KH002 |
Cambodia |
Introduction of High Efficiency LED Lighting Utilizing Wireless Network |
Project registered |
21 Feb 20 |
508 |
KE002 |
Kenya |
Introduction of Solar PV System at Salt Factory |
Project registered |
27 Jan 20 |
630 |
ID002 |
Indonesia |
Project of Introducing High Efficiency Refrigerator to a Food Industry Cold Storage in Indonesia |
Project registered |
29 Mar 15 |
120 |
MV002 |
Maldives |
Introduction of Smart Mini Grid System at Addu City |
Project registered |
02 Sep 23 |
1,039 |
BD002 |
Bangladesh |
Installation of High Efficiency Centrifugal Chiller for Air Conditioning System in Clothing Tag Factory in Bangladesh |
Project registered |
10 Jan 18 |
485 |
VN002 |
Viet Nam |
Promotion of green hospitals by improving efficiency / environment in national hospitals in Vietnam |
Project registered |
30 Nov 15 |
515 |
CL002 |
Chile |
3MW Solar Power Project in Chillan, Nuble Region |
Project registered |
08 Aug 22 |
2,318 |
PH002 |
Philippines |
Introduction of 1.53MW Rooftop Solar Power System in Auto Parts Factories |
Project registered |
04 Nov 21 |
954 |
LA002 |
Laos |
Introduction of 14MW floating solar power system in Vientiane |
Project registered |
05 Aug 22 |
6,838 |
VN001 |
Viet Nam |
Eco-Driving by Utilizing Digital Tachograph System |
Project registered |
04 Aug 15 |
292 |
LA001 |
Laos |
Lao PDR Energy Efficient Datacenter Project (LEED) |
Project registered |
31 Jul 17 |
567 |
CR001 |
Costa Rica |
5MW Solar Power Project in Belen |
Project registered |
23 Feb 20 |
2,111 |
ID001 |
Indonesia |
Energy Saving for Air-Conditioning and Process Cooling by Introducing High-efficiency Centrifugal Chiller |
Project registered |
31 Oct 14 |
114 |
PW001 |
Palau |
Small scale solar power plants for commercial facilities in island states |
Project registered |
21 Apr 15 |
227 |
MM001 |
Myanmar |
Yangon Waste to Energy plant by introducing power generation and avoidance of landfill gas emissions through combustion of municipal solid waste (MSW) |
Project registered |
16 Jan 20 |
4,067 |
MV001 |
Maldives |
Solar Power on Rooftop of School Building Project |
Project registered |
15 Jul 18 |
129 |
KH001 |
Cambodia |
Introduction of Ultra-lightweight Solar Panels for Power Generation at International School |
Project registered |
12 Mar 18 |
99 |
KE001 |
Kenya |
Electrification of communities using Ultra Low Head Micro Hydro Power Generation system |
Project registered |
27 Jan 20 |
75 |
SA001 |
Saudi Arabia |
Introduction of High Efficiency Electrolyzer in Chlor-Alkali Production Plant |
Project registered |
13 Jul 18 |
2,740 |
TH001 |
Thailand |
Introduction of Solar PV Systems on Rooftops of Factory and Office Building |
Project registered |
21 Aug 17 |
440 |
PH001 |
Philippines |
Introduction of 4 MW Rooftop Solar Power System in Tire Factory |
Project registered |
04 Nov 21 |
2,494 |
CL001 |
Chile |
Introduction of 1MW Rooftop Solar Power Systems to University |
Project registered |
08 Oct 19 |
500 |
MN001 |
Mongolia |
Installation of high-efficiency Heat Only Boilers in 118th School of Ulaanbaatar City Project |
Project registered |
30 Jun 15 |
92 |