Project : PH004 Introduction of 1MW Rooftop Solar Power System in Vehicle Assembly Factory

Project title Introduction of 1MW Rooftop Solar Power System in Vehicle Assembly Factory
Ref No. PH004
PDD form
Monitoring plan
MoC(PDF) MoC
Name of project participants (Philippines) Toyota Motor Philippines Corporation
Name of project participants (Japan) Toyota Motor Corporation
Name of third party entity (TPE) TPE-PH-001 Japan Quality Assurance Organization
Location of project Country: The Republic of the Philippines
Region/State/Province etc: Laguna
City/Town/Community etc: City of Santa Rosa
Latitude, longitude:

Latitude: N14°16'18.7"; Longitude: E 121°04'42.2"

Duration Starting date of project operation: 04 Jan 19
Expected operational lifetime of project: 9 years
Methodology No.
Emission Reductions (tCO2e) Estimated emission reductions in each year
  • - (in 2013)
  • - (in 2014)
  • - (in 2015)
  • - (in 2016)
  • - (in 2017)
  • - (in 2018)
  • 670 (in 2019)
  • 675 (in 2020)
  • 675 (in 2021)
  • 675 (in 2022)
  • 675 (in 2023)
  • 675 (in 2024)
  • 675 (in 2025)
  • 675 (in 2026)
  • 675 (in 2027)
  • 5 (in 2028)
  • - (in 2029)
  • - (in 2030)
Status Project registered
Public inputs
Registration