Logo_short_ph Philippines - Japan
  • Philippines-Top
  • FAQ
  • Home
  • About The Mechanism
  • Joint Committee
    • JC Members
    • JC Decision
  • Rules and Guidelines
  • Third Party Entity
  • Methodologies
    • Proposed methodologies
    • Approved methodologies
    • Methodologies under put on hold
  • Project Cycle Search
    • Project Cycle Search
    • Request for registration
    • Registered project
    • Issuance of credits
    • Request for post-registration changes
  • Contact us
  • Link

About the Mechanism

Basic Concept of the Joint Crediting Mechanism (JCM) more »

News

  • ·
    06 Jul 22
    Call for public inputs on a JCM proposed methodology “Installation of biomass power plant” (Philippines) (6 to 20 July 2022)
  • ·
    04 Nov 21
    Electronic Decision by the JC
  • ·
    21 Jan 21
    Call for public inputs on a proposed JCM project (Philippines) “Introduction of 1MW Rooftop Solar Power System in Vehicle Assembly Factory” (21 January to 19 February 2021)
  • ·
    09 Jan 21
    Call for public inputs on proposed JCM projects "Introduction of 4 MW Rooftop Solar Power System in Tire Factory", "Introduction of 1.53MW Rooftop Solar Power System in Auto Parts Factories" and "Installation of 1.2MW Rooftop Solar Power System in Freezing Warehouse" (Philippines) (9 January to 7 February 2021)
  • ·
    02 Feb 20
    Electronic Decision by the JC
  • ·
    30 Nov 19
    Electronic Decision by the JC
  • ·
    20 Nov 19
    Call for public inputs on JCM proposed methodologies “Electricity generation by installation of run-of-river hydro power generation system(s) in the Philippines” and “Installation of Solar PV System” (Philippines) (20 November to 4 December 2019)
  • ·
    09 Feb 18
    1st Joint Committee in Quezon City
  • ·
    12 Jan 17
    Japan and the Republic of the Philippines signed the bilateral document to start the JCM
  • more »