JC Decision

Decision Date
Decision by the Joint Committee (Electronic Decision) 09 Apr 23
Approval of a proposed methodology:
PH_AM003 "Installation of biomass power plant"
Registration of a proposed JCM project:
- PH004 "Introduction of 1MW Rooftop Solar Power System in Vehicle Assembly Factory"
Designation of a TPE based on their new accreditation under ISO 14065:
- LRQA Limited
Decision by the Joint Committee (Electronic Decision) 04 Nov 21
Registration of proposed JCM projects:
- PH001 “Introduction of 4 MW Rooftop Solar Power System in Tire Factory”
- PH002 “Introduction of 1.53MW Rooftop Solar Power System in Auto Parts Factories”
- PH003 “Installation of 1.2MW Rooftop Solar Power System in Freezing Warehouse”
Decision by the Joint Committee (Electronic Decision) 02 Feb 20
Approval of proposed methodologies:
PH_AM001 "Electricity generation by installation of run-of-river hydro power generation system(s) in the Philippines"
PH_AM002 "Installation of Solar PV System"
Decision by the Joint Committee (Electronic Decision) 30 Nov 19
Designation of third-party entities:
- Japan Quality Assurance Organization
- EPIC Sustainability Services Private Limited (EPIC)
- Lloyd’s Register Quality Assurance Limited (LRQA)
1st Joint Committee in Quezon City 09 Feb 18
Meeting Report
Annex 1: Joint Crediting Mechanism Rules of Procedures for the Joint Committee
Annex 2: Rules of Implementation for the Joint Crediting Mechanism (JCM)
Annex 3: Joint Crediting Mechanism Project Cycle Procedure
Annex 3.1. JCM Modalities of Communication Statement Form
Annex 3.2. JCM Validation Report Form
Annex 3.3. JCM Project Registration Request Form
Annex 3.4. JCM Verification Report Form
Annex 3.5. JCM Credits Issuance Request Form
Annex 3.6. JCM Approved Methodology Revision Request Form
Annex 3.7. JCM Post-Registration Changes Request Form
Annex 3.8. JCM Project Withdrawal Request Form
Annex 3.9. JCM Registration Request Withdrawal Form
Annex 3.10. JCM Issuance Request Withdrawal Form
Annex 4: Joint Crediting Mechanism Guidelines for Developing Proposed Methodology
Annex 5: Joint Crediting Mechanism Guidelines for Developing Project Design Document and Monitoring Report
Annex 6: Joint Crediting Mechanism Guidelines for Designation as a Third-Party Entity
Annex 7: Joint Crediting Mechanism Guidelines for Validation and Verification
Annex 8: Joint Crediting Mechanism Glossary of Terms
Annex 9: Common Specifications of the JCM Registry