News :
Call for public inputs on a proposed JCM project (Philippines) "9.6MW Solar Power Project in Collaboration with Power-supply Company" (1 February to 1 March 2024)

01 Feb 24

Call for public inputs on a proposed JCM project (Philippines) “9.6MW Solar Power Project in Collaboration with Power-supply Company” (1 February to 1 March 2024)

The draft PDD was submitted to the secretariat of the JC for the JCM between the Philippines and Japan on 30 January 2024.
The secretariat makes the draft PDD publicly available for public inputs in line with subsection 1.6.1. of the Joint Crediting Mechanism Project Cycle Procedure.

Information on the proposed project (PH005)

All stakeholders are invited to provide their inputs on the proposed project to the following email address ph-pdd-pi@jcm.go.jp only in English, including the following information:
- Name:
- Affiliated Organization:
- E-mail:
- Country:
- Part of the document (A/B/C/etc):
- Page of the document:
- Input on the page:

*NOTE: The secretariat makes all received inputs publicly available unless the TPE determines that the input is unauthentic in line with paragraph 37 of the Joint Crediting Mechanism Project Cycle Procedure.

This call for public inputs is open from 1 February to 1 March 2024 (24:00 GMT).