News :
Call for public inputs on proposed JCM projects "Introduction of 4 MW Rooftop Solar Power System in Tire Factory", "Introduction of 1.53MW Rooftop Solar Power System in Auto Parts Factories" and "Installation of 1.2MW Rooftop Solar Power System in Freezing Warehouse" (Philippines) (9 January to 7 February 2021)

09 Jan 21

*This call for public inputs has been closed.
Information on the proposed projects (PH001, PH002 and PH003)