News :
Electronic Decision by the JC

04 Nov 21

The Joint Committee adopted the decision on proposed projects by electronic means.

Registration of proposed JCM projects
- PH001 “Introduction of 4 MW Rooftop Solar Power System in Tire Factory”
- PH002 “Introduction of 1.53MW Rooftop Solar Power System in Auto Parts Factories”
- PH003 “Installation of 1.2MW Rooftop Solar Power System in Freezing Warehouse”