Project : TH009 Introduction of 30MW Rooftop Solar Power System to Large Supermarkets

Project title Introduction of 30MW Rooftop Solar Power System to Large Supermarkets
Ref No. TH009
PDD form
Monitoring plan
Name of project participants (Thailand) Impact Electrons Siam Co., Ltd.; Impact Solar Limited
Name of project participants (Japan) Sharp Energy Solutions Corporation
Name of third party entity (TPE) TPE-TH-003 Japan Quality Assurance Organization
Location of project Country: The Kingdom of Thailand
Region/State/Province etc: Various sites in Thailand
City/Town/Community etc: Supermarket 1 (Pathum Thani) 996.48kW: 41/10 Moo 3, Ban Chang, Muang Patum Thani, Patum Thani, 12000; Supermarket 2 (Ayutthaya) 996.48kW: 80 Moo 2 Ban Krod, Bang Pa-in Phra Nakhon Si Ayutthaya, 13160; Supermarket 3 (Buriram) 766.08kW: 150 Moo 7 Isan, Muang Buriram, 31000; Supermarket 4 (Chaiyaphum) 996.48kW: 99 Moo 1 Bung Khla, Muang Chaiyaphum, 36000; Supermarket 5 (Namyuen) 432.00kW: 199 Moo 15, Si Wichian, Nam Yuen, Ubon Ratchathani, 34260; Supermarket 6 (South Pattaya) 996.48kW: 565/41 Moo 10, Nongprue, Bang Lamung, Chonburi, 20150; Supermarket 7 (Lam Lukka) 996.48kW: 3/83 Moo 7 Lat Sawai, Lam Lukka Pathum Thani; Supermarket 8 (Wangnamyen) 443.52kW: 916 Moo1, Wang Nam Yen, Wang Nam Yen, Sa Kaeo; Supermarket 9 (Navanakorn) 996.48kW: 99 Moo3 Khlong Sam, Khlongluang Pathum Thani; Supermarket 10 (Omyai) 992.25kW: 17/17 Omyai, Sampran Nakhon Pathom; Supermarket 11 (Ratchaburi) 996.48kW: 534 Moo 1 Khoke Mor, Muang Ratchaburi; Supermarket 12 (Hangdong2) 593.28kW: 111 Moo 5 Hangdong, Hangdong Chiangmai; Supermarket 13 (Sukhothai) 996.48kW: 68 Moo 2 Ban Kluai, Muang Sukhothai; Supermarket 14 (Suksawat) 992.25kW: 94 Moo 18 Bang Phueng, Phrapadaeng Samutprakarn; Supermarket 15 (Lumphun) 846.72kW: No. 200 Moo 4 Ban Klang Sub-district, Mueang Lamphun District, Lamphun; Supermarket 16 (Yasothon) 996.48kW: 323 Moo 2 Samran, Muang Yasothon; Supermarket 17 (Lampang) 996.48kW: 65 Highway Lampang-Ngao Rd. Soptui, Muang Lampang; Supermarket 18 (Tha Tako) 587.52kW: 989 Moo 1, Tha Tako, Tha Tako, Nakornsawan; Supermarket 19 (Phrae) 789.12kW: 600 Moo 9, Nachak, Muang, Phrae; Supermarket 20 (Korat2) 875.52kW: 103 Phakthongchai Road, Naimuang, Muang, Nakornratchasima; Supermarket 21 (Suwannaphum) 576.00kW: 12 Moo 5, Srakoo, Suwannaphum, Roi Et; Supermarket 22 (Ladkrabang) 992.25kW: Khlong Preng, Mueang Chachoengsao District, Chachoengsao; Supermarket 23 (Dankhuntod) 564.48kW: 384 Moo 3, Dan Khun Thot, Dan Khun Thot, Nakornratchasima; Supermarket 24 (Wichienburi) 552.96kW: 157 Moo 4 Sapradu, Wichianburi, Phetchabun; Supermarket 25 (Nakhornpathom) 996.48kW: 754 Petchkasem Rd. Huayjarakae, Muang Nakhon Pathom; Supermarket 26 (Hangdong1) 996.48kW: 433/4-5 Moo 7 Mae Hia, Muang Chiangmai; Supermarket 27 (Phang Khon) 512.64kW: 506 Moo 8 Tambon Phang Khon, Amphoe Phang Khon, Sakon Nakhon; Supermarket 28 (Thanyaburi) 915.84kW: 158/17 Moo 4 Rangsit, Thanyaburi Pathum Thani; Supermarket 29 (Kham Ta Kla) 478.08kW: 296 Moo 11 Tambon Kham Ta Kla, Amphoe Kham Ta Kla, Sakon Nakhon; Supermarket 30 (Ban Dung) 633.60kW: 500 Moo 9, Boribandamri Road, Srisuttho, Bandung, Udonthani; Supermarket 31 (Phetchaburi) 887.04kW: 130 Moo 1 Ton Mamuang, Muang Phetchaburi; Supermarket 32 (Chonburi2) 806.40kW: 15/17 Moo 3 Huai Kapi, Muang Chonburi; Supermarket 33 (Roi-Et) 702.72kW: 320 Moo 10 Nuea Muang, Muang Roi Et; Supermarket 34 (Ban Phai) 581.76kW: 100 Moo 6 Huanong, Ban Phai, Khon Kaen, 40110; Supermarket 35 (Krabi) 997.92kW: 349 Moo 11 Karbi Noi, Muang Krabi, 81000; Supermarket 36 (Petchaboon) 997.92kW: 939 Moo 2 Sadiang, Muang Phetchaboon, 67000; Supermarket 37 (Chantaburi) 997.92kW: 1012, Thachalaeb Rd. Talad, Muang Chanthaburi, 22000
Latitude, longitude:

Supermarket 1: N14.0050, E100.5205;
Supermarket 2: N14.3193, E100.61121;
Supermarket 3: N14.9774, E103.07422;
Supermarket 4: N15.77739, E102.02705;
Supermarket 5: N14.4933, E105.0176;
Supermarket 6: N12.9156, E100.8940;
Supermarket 7: N13.93463, E100.71429;
Supermarket 8: N13.5100, E102.1777;
Supermarket 9: N14.1226, E100.61698;
Supermarket 10: N13.70651, E100.28121;
Supermarket 11: N13.5506, E99.8231;
Supermarket 12: N18.66776, E98.91456;
Supermarket 13: N17.01123, E99.77335;
Supermarket 14: N13.6538, E100.52238;
Supermarket 15: N18.591, E99.0412;
Supermarket 16: N15.82773, E104.11475;
Supermarket 17: N18.2755, E99.4812;
Supermarket 18: N15.6353, E100.4763;
Supermarket 19: N18.1284, E100.144;
Supermarket 20: N14.9486, E102.0542;
Supermarket 21: N15.5971, E103.8083;
Supermarket 22: N13.692197, E100.901588;
Supermarket 23: N15.1931, E101.7622;
Supermarket 24: N15.651145, E101.087099;
Supermarket 25: N13.8126, E100.072;
Supermarket 26: N18.74496, E98.96208;
Supermarket 27: N17.393359, E103.702359;
Supermarket 28: N14.0258, E100.7433;
Supermarket 29: N17.856384, E103.764704;
Supermarket 30: N17.674374, E103.251090;
Supermarket 31: N13.079, E99.9482;
Supermarket 32: N13.315733, E100.96029;
Supermarket 33: N16.0766, E103.6491;
Supermarket 34: N16.048073, E102.713432
Supermarket 35: N8.10837, E98.92927;
Supermarket 36: N16.398730, E101.138657;
Supermarket 37: N12.59817, E102.09929

Duration Starting date of project operation: 01 Aug 18
Expected operational lifetime of project: 17 years
Methodology No.
Emission Reductions (tCO2e) Estimated emission reductions in each year
  • - (in 2013)
  • - (in 2014)
  • - (in 2015)
  • - (in 2016)
  • - (in 2017)
  • 5,538 (in 2018)
  • 13,293 (in 2019)
  • 13,293 (in 2020)
  • 13,293 (in 2021)
  • 13,293 (in 2022)
  • 13,293 (in 2023)
  • 13,293 (in 2024)
  • 13,293 (in 2025)
  • 13,293 (in 2026)
  • 13,293 (in 2027)
  • 13,293 (in 2028)
  • 13,293 (in 2029)
  • 13,293 (in 2030)
Status Validation
Public inputs
  • 14 Nov 19  -  13 Dec 19