News

Subject Country Published date
Electronic Decision by the JC Tunisia 06 Apr 25
Electronic Decision by the JC Senegal 03 Apr 25
Electronic Decision by the JC Thailand 01 Apr 25
Electronic Decision by the JC Tunisia 29 Mar 25
Electronic Decision by the JC Mongolia 27 Mar 25
Electronic Decision by the JC Thailand 22 Mar 25
1st Joint Committee in Port Moresby and Online Papua New Guinea 21 Mar 25
Call for public inputs on a proposed JCM project "Introduction of 0.8MW Solar Power System to Aluminum Products, Packaging Materials and Automotive Parts Factories" (Philippines) (4 March to 2 April 2025) Philippines 04 Mar 25
1st Joint Committee in Tashkent and Online Uzbekistan 26 Feb 25
Call for public inputs on a proposed JCM project “9MW Solar Power Project in Yungay, Biobio Region” and “9MW Solar Power Project in San Antonio, Valparaiso Region” (Chile) (10 February to 11 March 2025) Chile 10 Feb 25
Call for public comments on proposed JCM projects (Thailand) "Energy saving by installation of evaporator with mechanical vapor recompression and high-efficiency chiller" and "LED lighting introduction business for the sales store" (10 February to 11 March 2025) Thailand 10 Feb 25
Call for public comments on SDSAR of proposed JCM project (Thailand) "Introduction of 0.8MW Solar Power System and High Efficiency Refrigerator to Food Factory" (10 February to 11 March 2025) Thailand 10 Feb 25
Call for public inputs on a JCM proposed methodology “Energy Saving by Introduction of High Firewood Efficiency Cookstove to Replace Traditional Cookstove” (Cambodia) (7 to 21 February 2025) Cambodia 07 Feb 25
Call for public comments on a proposed JCM project "Introduction of 3.1MW Rooftop Solar Power System to Fast-Moving Consumer Goods and Printing Factories in Java Island" (Indonesia) (7 February to 8 March 2025) Indonesia 07 Feb 25
Call for public comments on a proposed JCM project "Introduction of High-efficiency Once-through Boiler System to Chemical Factory" (Indonesia) (4 February to 5 March 2025) Indonesia 04 Feb 25
Call for public inputs on a proposed JCM project "14.5MW Mini Hydro Power Plant Project in Siguil River in Mindanao" (Philippines) (4 February to 5 March 2025) Philippines 04 Feb 25
Electronic Decision by the JC Philippines 03 Feb 25
Call for public comments on SDSAR of registered JCM projects "Installation of Co-Generation Plant for On-Site Energy Supply and High Efficiency Non-Inverter Type Centrifugal Chiller in Motorcycle Factory" and "Introduction of 5MW Floating Solar Power System on Industrial Water Reservoir in Thailand" (Thailand) (28 January to 26 February 2025) Thailand 28 Jan 25
1st Joint Committee in Astana and Online Kazakhstan 28 Jan 25
Call for public comments on proposed revisions to the approved methodology TH_AM001 "Installation of Solar PV System" (Thailand) (24 January to 7 February 2025) Thailand 24 Jan 25