Call for public comments on a proposed JCM project (Indonesia) “Introduction of High Efficiency Once-through Boiler in Golf Ball Factory” (25 March to 23 April 2019) |
Indonesia |
25 Mar 19 |
Call for public comments on JCM proposed methodology “Electricity generation by installation of run-of-river hydro power generation system(s) in Indonesia” (Indonesia) (25 March to 8 April 2019) |
Indonesia |
25 Mar 19 |
Electronic Decision by the JC |
Maldives |
17 Mar 19 |
Electronic Decision by the JC |
Mongolia |
15 Mar 19 |
Electronic Decision by the JC |
Myanmar |
15 Mar 19 |
Electronic Decision by the JC |
Laos |
11 Mar 19 |
Call for public inputs on a proposed JCM project (Bangladesh) “Energy Saving for Air Conditioning & Facility Cooling by High Efficiency Chiller (Dhaka Suburbs)” (7 March to 5 April 2019) |
Bangladesh |
07 Mar 19 |
Electronic Decision by the JC |
Indonesia |
07 Mar 19 |
Call for public comments on a proposed JCM project (Indonesia) “Introduction of High-efficiency Once-through Boiler in Film Factory” (19 February to 20 March 2019) |
Indonesia |
19 Feb 19 |
Call for public inputs on JCM proposed methodology “Installation of compressor control system(s) for split type air conditioner(s)” (Viet Nam) (16 February to 2 March 2019) |
Viet Nam |
16 Feb 19 |
Call for public inputs on a proposed JCM project (Chile) “Introduction of 1MW Rooftop Solar Power Systems to University” (7 February to 8 March 2019) |
Chile |
07 Feb 19 |
Call for public inputs on a proposed JCM project (Viet Nam) “Introduction of high-efficient wire stranding machines to the factory of YAZAKI EDS VIETNAM Co., LTD.” (5 February to 6 March 2019) |
Viet Nam |
05 Feb 19 |
Call for public inputs on a proposed JCM project (Viet Nam) “Introduction of Amorphous High Efficiency Transformers in Northern, Central and Southern Power Grids” (24 January to 22 February 2019) |
Viet Nam |
24 Jan 19 |
Electronic Decision by the JC |
Laos |
18 Jan 19 |
Electronic Decision by the JC |
Thailand |
14 Jan 19 |
Electronic Decision by the JC |
Saudi Arabia |
04 Jan 19 |
Call for public comments on a proposed JCM project (Indonesia) “Introduction of High-Efficiency Looms in Weaving Mill” (26 December 2018 to 24 January 2019) |
Indonesia |
26 Dec 18 |
Call for public comments on a proposed JCM project (Indonesia) “Installation of gas engine cogeneration system to supply electricity and heat to the vehicle manufacturing factory of PT. Toyota Motor Manufacturing Indonesia” (14 December 2018 to 12 January 2019) |
Indonesia |
14 Dec 18 |
Call for public inputs on JCM proposed methodology “Introduction of High Efficiency Centrifugal Chiller” (Cambodia) (14 December to 28 December 2018) |
Cambodia |
14 Dec 18 |
Call for public inputs on a proposed JCM project (Myanmar) “Yangon Waste to Energy plant by introducing power generation and avoidance of landfill gas emissions through combustion of municipal solid waste (MSW)” (11 December 2018 to 9 January 2019) |
Myanmar |
11 Dec 18 |