The 7th Joint Committee of the Joint Crediting Mechanism between Mongolia and Japan was held virtually.

Meeting Report
Annex 1: Rules of Implementation for the JCM
Annex 2: Common Specifications of the JCM Registry
Annex 3: JCM Project Cycle Procedure
Annex 3.1: Assessment of reference emissions request form
Annex 3.2: Renewal of crediting period request form
Annex 4: Guidelines for Developing Proposed Methodology
Annex 5: Guidelines for Developing Project Design Document and Monitoring Report
Annex 6: Rules of Procedures for the Joint Committee
Annex 7: Glossary of Terms

Decision on extension of the interim special measure for on-site assessment by TPEs
The Joint Committee decided to extend the period in which Third-Party Entities (TPEs) may apply the interim special measure for on-site assessment until 31 December 2022.
Reference: Decision on interim special measure for on-site assessment
https://www.jcm.go.jp/jc_decisions/1751/Decision_on_interim_special_measure_for_on-site_assessment_by_TPEs.pdf

Decision on extension of the interim special measure for on-site assessment by TPEs

Decision on issuance of credits
- MN003 “Installation of 12.7MW Solar Power Plant for Power Supply In Ulaanbaatar Suburb" for the monitoring period of 01 Jun 18 – 31 Dec 20