Category | Rules and Guidelines | Forms |
---|---|---|
General | Bilateral Document histories |
|
Modification of Bilateral Document (as of 20 July 2016) | ||
Rules of Implementation ver06.0 histories |
||
Glossary of Terms ver02.0 histories |
||
Common Specifications of the JCM Registry ver02.0 | ||
Project Cycle | Project Cycle Procedure ver07.0 histories |
|
Guidelines for Developing Proposed Methodology ver03.0 histories |
|
|
Guidelines for Developing Project Design Document and Monitoring Report ver04.0 histories |
|
|
Guidelines for Developing Sustainable Development Contribution Plan and Report ver01.0 |
|
|
Third-Party Entity (TPE) | Guidelines for Designation as a Third-Party Entity ver04.0 histories |
|
Guidelines for Validation and Verification ver01.0 histories |
|
|
Joint Committee (JC) | Rules of Procedures for the Joint Committee ver03.0 histories |
*NOTE:
Where a submission including a proposed methodology, PDD and accompanying additional/supporting documents contains information that the methodology proponents or project participants wish to be treated as confidential or proprietary, those entities are required to submit documentation in two versions:
(a) One version where all parts containing confidential or proprietary information are made illegible (e.g. by covering those parts with black ink or overwrite those parts with letters such as “XXX”) so that the version can be made publicly available without displaying confidential or proprietary information;
(b) Another version containing all information that is to be treated as strictly confidential or proprietary by all parties handling this documentation (the third-party entities, the Joint Committee members, external experts).