JC Decision

Decision Date
Decision by the Joint Committee (Electronic Decision) 04 Aug 24
Approval of a revised methodology
MN_AM003 (ver03.0) "Installation of Solar PV System"
Reinstatement of designation of a third-party entity
- ERM Certification and Verification Services Limited
Decision by the Joint Committee (Electronic Decision) 26 Jan 24
Designation of third-party entities:
- Enviance Services Private Limited
- Ampere For Renewable Energy
Decision by the Joint Committee (Electronic Decision) 02 Jun 23
Registration of a proposed JCM project:
- MN006 "Introduction of 15MW Solar Power System near New Airport"
Designation of a third-party entity:
- LGAI Technological Center S.A. (Applus+ Certification)
Decision by the Joint Committee (Electronic Decision) 28 May 22
Rules of Implementation for the Joint Crediting Mechanism (JCM) ver06.0
7th Joint Committee 08 Feb 22
Meeting Report
Annex 1: Rules of Implementation for the JCM (version 05.0)
Annex 2: Common Specifications of the JCM Registry (version 02.0)
Annex 3: JCM Project Cycle Procedure (version 07.0)
Annex 3.1: Assessment of reference emissions request form (version 01.0)
Annex 3.2: Renewal of crediting period request form (version 01.0)
Annex 4: Guidelines for Developing Proposed Methodology (version 03.0)
Annex 5: Guidelines for Developing Project Design Document and Monitoring Report (version 04.0)
Annex 6: Rules of Procedures for the Joint Committee (version 03.0)
Annex 7 Glossary of Terms (version 02.0)
Decision on extension of the interim special measure for on-site assessment by TPEs
Decision on issuance of credits
- MN003 “Installation of 12.7MW Solar Power Plant for Power Supply In Ulaanbaatar Suburb" for the monitoring period of 01 Jun 18 – 31 Dec 20
Decision by the Joint Committee (Electronic Decision) 03 May 21
Designation of a TPE based on their new accreditation under the ISO 14065:
- Lloyd’s Register Quality Assurance Limited
Decision by the Joint Committee (Electronic Decision) 04 Jan 21
Decision on interim special measure for on-site assessment by TPEs
Decision by the Joint Committee (Electronic Decision) 17 May 19
Decision on issuance of credits
- MN005 “A HIGH EFFICIENCY AND LOW LOSS POWER TRANSMISSION AND DISTRIBUTION SYSTEM IN MONGOLIA” for the monitoring period of 02 Dec 17 – 31 Dec 18
Decision by the Joint Committee (Electronic Decision) 15 Mar 19
Designation of a TPE for an additional sectoral scope of 12 for validation and verification:
- EPIC Sustainability Services Private Limited (EPIC)
6th Joint Committee in Ulaanbaatar 06 Nov 18
Meeting Report
Annex 1: Rules of Implementation for the JCM (version 04.0)
Annex 2 JCM Project Cycle Procedure (version 06.0)
Annex 3: Guidelines for Developing Sustainable Development Contribution Plan and Report (version 01.0)
Approval of request for post-registration changes:
- MN003 “Installation of 12.7MW Solar Power Plant for Power Supply In Ulaanbaatar Suburb"
Decision on issuance of credits
- MN001 “Installation of high-efficiency Heat Only Boilers in 118th School of Ulaanbaatar City Project” for the monitoring period of 20 Sep 16 – 15 May 18
Decision by the Joint Committee (Electronic Decision) 16 Nov 17
Registration of a proposed JCM project:
- MN005 “A HIGH EFFICIENCY AND LOW LOSS POWER TRANSMISSION AND DISTRIBUTION SYSTEM IN MONGOLIA”
5th Joint Committee in Ulaanbaatar 24 Oct 17
Meeting Report
Annex 1: JCM Project Cycle Procedure (version 05.0)
Annex 2: JCM Credits Issuance Request Form (version 04.0)
Decision on issuance of credits
- MN004 “10MW Solar Power Project in Darkhan City” for the monitoring period of 01 Jan 17 – 31 Jul 17
Decision by the Joint Committee 24 Oct 17
JCM Guidelines for Developing Project Design Document and Monitoring Report (version 03.1)
JCM Verification Report Form (version 02.1)
Decision by the Joint Committee (Electronic Decision) 28 Aug 17
Designation of a TPE for additional sectoral scopes of 1, 2 and 3 for verification
- Japan Management Association
Decision by the Joint Committee (Electronic Decision) 26 May 17
Registration of proposed JCM projects:
- MN003 “Installation of 2.1MW Solar Power Plant for Power Supply in Ulaanbaatar Suburb”
- MN004 “10MW Solar Power Project in Darkhan City”
Designation of third-party entities:
- Low Carbon Technology Center NGO
Decision by the Joint Committee (Electronic Decision) 30 Jan 17
Approval of the revised methodology with revisions
MN_AM003 (ver02.0) "Installation of Solar PV System"
4th Joint Committee in Ulaanbaatar 29 Sep 16
Meeting Report
Annex 1: MN_AM003 “Installation of Solar PV System”
Decision on issuance of credits
- MN001 “Installation of high-efficiency Heat Only Boilers in 118th School of Ulaanbaatar City Project” for the monitoring period of 20 Sep 15 – 15 May 16
- MN002 “Centralization of heat supply system by installation of high-efficiency Heat Only Boilers in Bornuur soum Project” for the monitoring period of 15 Sep 15 – 02 May 16
Decision by the Joint Committee (Electronic Decision) 20 Aug 16
Rules of Implementation for the Joint Crediting Mechanism (JCM) ver03.0
Joint Crediting Mechanism Guidelines for Developing Project Design Document and Monitoring Report ver03.0
JCM Credits Issuance Request Form ver03.0
JCM Verification Report Form ver02.0
Designation of a TPE for an additional sectoral scope 10
- Japan Quality Assurance Organization
Decision by the Joint Committee (Electronic Decision) 30 Jul 16
Rules of Implementation for the Joint Crediting Mechanism (JCM) ver02.0
Joint Crediting Mechanism Project Cycle Procedure ver04.0
JCM Modalities of Communication Statement Form ver02.0
JCM Credits Issuance Request Form ver02.0
Joint Crediting Mechanism Guidelines for Developing Proposed Methodology ver02.0
Joint Crediting Mechanism Guidelines for Developing Project Design Document and Monitoring Report ver02.0
Joint Crediting Mechanism Guidelines for Designation of a Third-Party Entity ver04.0
Common Specifications of the JCM Registry ver01.0
Decision by the Joint Committee (Electronic Decision) 26 Sep 15
Designation of third-party entities:
- ERM Certification and Verification Services Limited
3rd Joint Committee in Ulaanbaatar 30 Jun 15
Meeting Report
Registration of proposed JCM projects:
-MN001 "Installation of high-efficiency Heat Only Boilers in 118th School of Ulaanbaatar City Project"
-MN002 "Centralization of heat supply system by installation of high-efficiency Heat Only Boilers in Bornuur soum Project"
Decision by the Joint Committee (Electronic Decision) 27 Apr 15
Designation of third-party entities:
- National Renewable Energy Centre
Decision by the Joint Committee (Electronic Decision) 05 Apr 15
Joint Crediting Mechanism Rules of Procedures for the Joint Committee ver02.0
Joint Crediting Mechanism Project Cycle Procedure ver03.0
Joint Crediting Mechanism Guidelines for Designation as a Third-Party Entity ver03.0
Designation of third-party entities:
- EPIC Sustainability Services Private Limited (EPIC)
Decision by the Joint Committee (Electronic Decision) 28 Jan 15
Approval of a proposed methodology with revisions:
MN_AM002 "Replacement and Installation of High Efficiency Heat Only Boiler (HOB) for Hot Water Supply Systems"
Decision by the Joint Committee (Electronic Decision) 24 Dec 14
Joint Crediting Mechanism Guidelines for Designation as a Third-Party Entity ver02.0
Decision by the Joint Committee (Electronic Decision) 09 Sep 14
Designation of third-party entities:
TUV Rheinland (China) Ltd
2nd Joint Committee in Ulaanbaatar 20 Feb 14
Meeting Report
Annex 1: MN_AM001 "Installation of energy-saving transmission lines in the Mongolian Grid"
Decision by the Joint Committee (Electronic Decision) 15 Jan 14
Designation of third-party entities:
- SGS United Kingdom Limited
- KBS Certification Services Pvt. Ltd.
Decision by the Joint Committee (Electronic Decision) 24 Dec 13
Designation of third-party entities:
- TÜV SÜD South Asia Private Limited
Decision by the Joint Committee (Electronic Decision) 05 Dec 13
Designation of third-party entities:
- Deloitte Tohmatsu Evaluation and Certification Organization Co., Ltd.
- Lloyd's Register Quality Assurance Limited
Decision by the Joint Committee (Electronic Decision) 16 Oct 13
Designation of third-party entities:
- JACO CDM., LTD
Decision by the Joint Committee (Electronic Decision) 24 Sep 13
Joint Crediting Mechanism Project Cycle Procedure ver02.0
JCM Modalities of Communication Statement Form ver01.0
JCM Validation Report Form ver01.0
JCM Project Registration Request Form ver01.0
JCM Verification Report Form ver01.0
JCM Credits Issuance Request Form ver01.0
JCM Approved Methodology Revision Request Form ver01.0
JCM Post-Registration Changes Request Form ver01.0
JCM Registration Request Withdrawal Form ver01.0
JCM Project Withdrawal Request Form ver01.0
JCM Issuance Request Withdrawal Form ver01.0
Designation of third-party entities:
- URS Verification Private Limited
- Japan Consulting Institute
- Japan Quality Assurance Organization
- Japan Management Association
Decision by the Joint Committee (Electronic Decision) 23 May 13
Joint Crediting Mechanism Project Cycle Procedure
Joint Crediting Mechanism Guidelines for Developing Proposed Methodology
Joint Crediting Mechanism Guidelines for Developing Project Design Document and Monitoring Report
Joint Crediting Mechanism Guidelines for Designation as a Third-Party Entity
Joint Crediting Mechanism Guidelines for Validation and Verification
Joint Crediting Mechanism Glossary of Terms
1st Joint Committee in Ulaanbaatar 11 Apr 13
Meeting Report
Annex 1: Joint Crediting Mechanism Rules of Procedures for the Joint Committee
Annex 2: Rules of Implementation for the JCM