Decision by the Joint Committee (Electronic Decision) |
04 Aug 24 |
Approval of a revised methodology
|
|
MN_AM003 (ver03.0) "Installation of Solar PV System"
|
|
Reinstatement of designation of a third-party entity
|
|
- ERM Certification and Verification Services Limited
|
|
Decision by the Joint Committee (Electronic Decision) |
26 Jan 24 |
Designation of third-party entities:
|
|
- Enviance Services Private Limited
|
|
- Ampere For Renewable Energy
|
|
Decision by the Joint Committee (Electronic Decision) |
02 Jun 23 |
Registration of a proposed JCM project:
|
|
- MN006 "Introduction of 15MW Solar Power System near New Airport"
|
|
Designation of a third-party entity:
|
|
- LGAI Technological Center S.A. (Applus+ Certification)
|
|
Decision by the Joint Committee (Electronic Decision) |
28 May 22 |
Rules of Implementation for the Joint Crediting Mechanism (JCM) ver06.0
|
|
7th Joint Committee |
08 Feb 22 |
Meeting Report
|
|
Annex 1: Rules of Implementation for the JCM (version 05.0)
|
|
Annex 2: Common Specifications of the JCM Registry (version 02.0)
|
|
Annex 3: JCM Project Cycle Procedure (version 07.0)
|
|
Annex 3.1: Assessment of reference emissions request form (version 01.0)
|
|
Annex 3.2: Renewal of crediting period request form (version 01.0)
|
|
Annex 4: Guidelines for Developing Proposed Methodology (version 03.0)
|
|
Annex 5: Guidelines for Developing Project Design Document and Monitoring Report (version 04.0)
|
|
Annex 6: Rules of Procedures for the Joint Committee (version 03.0)
|
|
Annex 7 Glossary of Terms (version 02.0)
|
|
Decision on extension of the interim special measure for on-site assessment by TPEs
|
|
Decision on issuance of credits
|
|
- MN003 “Installation of 12.7MW Solar Power Plant for Power Supply In Ulaanbaatar Suburb" for the monitoring period of 01 Jun 18 – 31 Dec 20
|
|
Decision by the Joint Committee (Electronic Decision) |
03 May 21 |
Designation of a TPE based on their new accreditation under the ISO 14065:
|
|
- Lloyd’s Register Quality Assurance Limited
|
|
Decision by the Joint Committee (Electronic Decision) |
04 Jan 21 |
Decision on interim special measure for on-site assessment by TPEs
|
|
Decision by the Joint Committee (Electronic Decision) |
17 May 19 |
Decision on issuance of credits
|
|
- MN005 “A HIGH EFFICIENCY AND LOW LOSS POWER TRANSMISSION AND DISTRIBUTION SYSTEM IN MONGOLIA” for the monitoring period of 02 Dec 17 – 31 Dec 18
|
|
Decision by the Joint Committee (Electronic Decision) |
15 Mar 19 |
Designation of a TPE for an additional sectoral scope of 12 for validation and verification:
|
|
- EPIC Sustainability Services Private Limited (EPIC)
|
|
6th Joint Committee in Ulaanbaatar |
06 Nov 18 |
Meeting Report
|
|
Annex 1: Rules of Implementation for the JCM (version 04.0)
|
|
Annex 2 JCM Project Cycle Procedure (version 06.0)
|
|
Annex 3: Guidelines for Developing Sustainable Development Contribution Plan and Report (version 01.0)
|
|
Approval of request for post-registration changes:
|
|
- MN003 “Installation of 12.7MW Solar Power Plant for Power Supply In Ulaanbaatar Suburb"
|
|
Decision on issuance of credits
|
|
- MN001 “Installation of high-efficiency Heat Only Boilers in 118th School of Ulaanbaatar City Project” for the monitoring period of 20 Sep 16 – 15 May 18
|
|
Decision by the Joint Committee (Electronic Decision) |
16 Nov 17 |
Registration of a proposed JCM project:
|
|
- MN005 “A HIGH EFFICIENCY AND LOW LOSS POWER TRANSMISSION AND DISTRIBUTION SYSTEM IN MONGOLIA”
|
|
5th Joint Committee in Ulaanbaatar |
24 Oct 17 |
Meeting Report
|
|
Annex 1: JCM Project Cycle Procedure (version 05.0)
|
|
Annex 2: JCM Credits Issuance Request Form (version 04.0)
|
|
Decision on issuance of credits
|
|
- MN004 “10MW Solar Power Project in Darkhan City” for the monitoring period of 01 Jan 17 – 31 Jul 17
|
|
Decision by the Joint Committee |
24 Oct 17 |
JCM Guidelines for Developing Project Design Document and Monitoring Report (version 03.1)
|
|
JCM Verification Report Form (version 02.1)
|
|
Decision by the Joint Committee (Electronic Decision) |
28 Aug 17 |
Designation of a TPE for additional sectoral scopes of 1, 2 and 3 for verification
|
|
- Japan Management Association
|
|
Decision by the Joint Committee (Electronic Decision) |
26 May 17 |
Registration of proposed JCM projects:
|
|
- MN003 “Installation of 2.1MW Solar Power Plant for Power Supply in Ulaanbaatar Suburb”
|
|
- MN004 “10MW Solar Power Project in Darkhan City”
|
|
Designation of third-party entities:
|
|
- Low Carbon Technology Center NGO
|
|
Decision by the Joint Committee (Electronic Decision) |
30 Jan 17 |
Approval of the revised methodology with revisions
|
|
MN_AM003 (ver02.0) "Installation of Solar PV System"
|
|
4th Joint Committee in Ulaanbaatar |
29 Sep 16 |
Meeting Report
|
|
Annex 1: MN_AM003 “Installation of Solar PV System”
|
|
Decision on issuance of credits
|
|
- MN001 “Installation of high-efficiency Heat Only Boilers in 118th School of Ulaanbaatar City Project” for the monitoring period of 20 Sep 15 – 15 May 16
|
|
- MN002 “Centralization of heat supply system by installation of high-efficiency Heat Only Boilers in Bornuur soum Project” for the monitoring period of 15 Sep 15 – 02 May 16
|
|
Decision by the Joint Committee (Electronic Decision) |
20 Aug 16 |
Rules of Implementation for the Joint Crediting Mechanism (JCM) ver03.0
|
|
Joint Crediting Mechanism Guidelines for Developing Project Design Document and Monitoring Report ver03.0
|
|
JCM Credits Issuance Request Form ver03.0
|
|
JCM Verification Report Form ver02.0
|
|
Designation of a TPE for an additional sectoral scope 10
|
|
- Japan Quality Assurance Organization
|
|
Decision by the Joint Committee (Electronic Decision) |
30 Jul 16 |
Rules of Implementation for the Joint Crediting Mechanism (JCM) ver02.0
|
|
Joint Crediting Mechanism Project Cycle Procedure ver04.0
|
|
JCM Modalities of Communication Statement Form ver02.0
|
|
JCM Credits Issuance Request Form ver02.0
|
|
Joint Crediting Mechanism Guidelines for Developing Proposed Methodology ver02.0
|
|
Joint Crediting Mechanism Guidelines for Developing Project Design Document and Monitoring Report ver02.0
|
|
Joint Crediting Mechanism Guidelines for Designation of a Third-Party Entity ver04.0
|
|
Common Specifications of the JCM Registry ver01.0
|
|
Decision by the Joint Committee (Electronic Decision) |
26 Sep 15 |
Designation of third-party entities:
|
|
- ERM Certification and Verification Services Limited
|
|
3rd Joint Committee in Ulaanbaatar |
30 Jun 15 |
Meeting Report
|
|
Registration of proposed JCM projects:
|
|
-MN001 "Installation of high-efficiency Heat Only Boilers in 118th School of Ulaanbaatar City Project"
|
|
-MN002 "Centralization of heat supply system by installation of high-efficiency Heat Only Boilers in Bornuur soum Project"
|
|
Decision by the Joint Committee (Electronic Decision) |
27 Apr 15 |
Designation of third-party entities:
|
|
- National Renewable Energy Centre
|
|
Decision by the Joint Committee (Electronic Decision) |
05 Apr 15 |
Joint Crediting Mechanism Rules of Procedures for the Joint Committee ver02.0
|
|
Joint Crediting Mechanism Project Cycle Procedure ver03.0
|
|
Joint Crediting Mechanism Guidelines for Designation as a Third-Party Entity ver03.0
|
|
Designation of third-party entities:
|
|
- EPIC Sustainability Services Private Limited (EPIC)
|
|
Decision by the Joint Committee (Electronic Decision) |
28 Jan 15 |
Approval of a proposed methodology with revisions:
|
|
MN_AM002 "Replacement and Installation of High Efficiency Heat Only Boiler (HOB) for Hot Water Supply Systems"
|
|
Decision by the Joint Committee (Electronic Decision) |
24 Dec 14 |
Joint Crediting Mechanism Guidelines for Designation as a Third-Party Entity ver02.0
|
|
Decision by the Joint Committee (Electronic Decision) |
09 Sep 14 |
Designation of third-party entities:
|
|
TUV Rheinland (China) Ltd
|
|
2nd Joint Committee in Ulaanbaatar |
20 Feb 14 |
Meeting Report
|
|
Annex 1: MN_AM001 "Installation of energy-saving transmission lines in the Mongolian Grid"
|
|
Decision by the Joint Committee (Electronic Decision) |
15 Jan 14 |
Designation of third-party entities:
|
|
- SGS United Kingdom Limited
|
|
- KBS Certification Services Pvt. Ltd.
|
|
Decision by the Joint Committee (Electronic Decision) |
24 Dec 13 |
Designation of third-party entities:
|
|
- TÜV SÜD South Asia Private Limited
|
|
Decision by the Joint Committee (Electronic Decision) |
05 Dec 13 |
Designation of third-party entities:
|
|
- Deloitte Tohmatsu Evaluation and Certification Organization Co., Ltd.
|
|
- Lloyd's Register Quality Assurance Limited
|
|
Decision by the Joint Committee (Electronic Decision) |
16 Oct 13 |
Designation of third-party entities:
|
|
- JACO CDM., LTD
|
|
Decision by the Joint Committee (Electronic Decision) |
24 Sep 13 |
Joint Crediting Mechanism Project Cycle Procedure ver02.0
|
|
JCM Modalities of Communication Statement Form ver01.0
|
|
JCM Validation Report Form ver01.0
|
|
JCM Project Registration Request Form ver01.0
|
|
JCM Verification Report Form ver01.0
|
|
JCM Credits Issuance Request Form ver01.0
|
|
JCM Approved Methodology Revision Request Form ver01.0
|
|
JCM Post-Registration Changes Request Form ver01.0
|
|
JCM Registration Request Withdrawal Form ver01.0
|
|
JCM Project Withdrawal Request Form ver01.0
|
|
JCM Issuance Request Withdrawal Form ver01.0
|
|
Designation of third-party entities:
|
|
- URS Verification Private Limited
|
|
- Japan Consulting Institute
|
|
- Japan Quality Assurance Organization
|
|
- Japan Management Association
|
|
Decision by the Joint Committee (Electronic Decision) |
23 May 13 |
Joint Crediting Mechanism Project Cycle Procedure
|
|
Joint Crediting Mechanism Guidelines for Developing Proposed Methodology
|
|
Joint Crediting Mechanism Guidelines for Developing Project Design Document and Monitoring Report
|
|
Joint Crediting Mechanism Guidelines for Designation as a Third-Party Entity
|
|
Joint Crediting Mechanism Guidelines for Validation and Verification
|
|
Joint Crediting Mechanism Glossary of Terms
|
|
1st Joint Committee in Ulaanbaatar |
11 Apr 13 |
Meeting Report
|
|
Annex 1: Joint Crediting Mechanism Rules of Procedures for the Joint Committee
|
|
Annex 2: Rules of Implementation for the JCM
|
|