Electronic Decision by the JC |
Saudi Arabia |
13 Jul 18 |
8th Joint Committee in Jakarta |
Indonesia |
10 Jul 18 |
Call for public inputs on JCM proposed methodology “Installation of Solar PV System” (Laos) (6 July to 20 July 2018) |
Laos |
06 Jul 18 |
Call for public comments on a proposed revision to the approved methodology ID_AM009 “Replacement of conventional burners with regenerative burners for aluminum holding furnaces” (Indonesia) (3 July to 17 July 2018) |
Indonesia |
03 Jul 18 |
Electronic Decision by the JC |
Myanmar |
25 Jun 18 |
Call for public comments on JCM proposed methodology “Installation of Solar PV System and Storage Battery System” (Indonesia) (23 June to 7 July 2018) |
Indonesia |
23 Jun 18 |
Decision by the JC |
Bangladesh |
04 Jun 18 |
Decision by the JC |
Maldives |
31 May 18 |
4th Joint Committee in Phnom Penh |
Cambodia |
30 May 18 |
4th Joint Committee in Bangkok |
Thailand |
20 Apr 18 |
Decision by the JC |
Costa Rica |
10 Apr 18 |
Call for public comments on JCM proposed methodologies (Indonesia) “Energy Saving by Introduction of High Efficiency Once-through Boiler” and “Installation of gas engine cogeneration system to supply electricity and heat to facility” (3 April to 17 April 2018) |
Indonesia |
03 Apr 18 |
Call for public comments on a proposed JCM project (Thailand) “Introduction of 3.4MW Rooftop Solar Power System to Air-conditioning Parts Factories” (28 March to 26 April 2018) |
Thailand |
28 Mar 18 |
Call for public inputs on a JCM proposed methodology (Myanmar) “Power generation and avoidance of landfill gas emissions through combustion of municipal solid waste (MSW)” (23 March 2018 to 6 April 2018) |
Myanmar |
23 Mar 18 |
2nd Joint Committee in Nay Pyi Taw |
Myanmar |
21 Mar 18 |
3rd Joint Committee in Male |
Maldives |
19 Mar 18 |
Electronic Decision by the JC |
Bangladesh |
15 Mar 18 |
Electronic Decision by the JC |
Costa Rica |
12 Mar 18 |
Electronic Decision by the JC |
Cambodia |
12 Mar 18 |
Call for public comments on a proposed JCM project (Indonesia) “Installation of Tribrid System to mobile communication’s Base Transceiver Stations in Republic of Indonesia” (28 February to 29 March 2018) |
Indonesia |
28 Feb 18 |