Call for public inputs on a proposed JCM project (Maldives) “Solar Power on Rooftop of School Building Project” (28 February to 29 March 2018) |
Maldives |
28 Feb 18 |
Call for public comments on proposed JCM projects (Thailand) “Installation of High Efficiency Air Conditioning System and Chillers in Semiconductor Factory” and "Energy Saving for Semiconductor Factory with High Efficiency Centrifugal Chiller and Compressor" (17 February to 18 March 2018) |
Thailand |
17 Feb 18 |
1st Joint Committee in Quezon City |
Philippines |
09 Feb 18 |
Call for public comments on a proposed JCM project (Thailand) “Reducing GHG emission at Textile Factory of Luckytex (Thailand) Public Company Limited by Upgrading to Air-saving Loom” (6 February to 7 March 2018) |
Thailand |
06 Feb 18 |
Call for public comments on a proposed JCM project (Indonesia) “Reducing GHG emission at textile factories by upgrading to air-saving loom” (6 February to 7 March 2018) |
Indonesia |
06 Feb 18 |
5th Joint Committee in Koror |
Palau |
30 Jan 18 |
Call for public inputs on a proposed JCM project (Saudi Arabia) “Introduction of High Efficiency Electrolyzer in Chlor-Alkali Production Plant” (30 January 2018 to 28 February 2018) |
Saudi Arabia |
30 Jan 18 |
Decision by the Joint Committee |
Myanmar |
18 Jan 18 |
Call for public inputs on proposed revisions to the approved methodology BD_AM001 “Energy Saving by Introduction of High Efficiency Centrifugal Chiller” (Bangladesh) (12 January to 26 January 2018) |
Bangladesh |
12 Jan 18 |
Call for public comments on a proposed JCM project (Indonesia) “Energy saving by optimum operation at an oil refinery” (12 January to 10 February 2018) |
Indonesia |
12 Jan 18 |
4th Joint Committee in Tokyo |
Bangladesh |
10 Jan 18 |
Electronic Decision by the JC |
Mexico |
29 Dec 17 |
Call for public comments on a JCM proposed methodology (Thailand) “Power Generation by Waste Heat Recovery in Cement Industry” (27 December 2017 to 10 January 2018) |
Thailand |
27 Dec 17 |
Call for public inputs on a proposed JCM project (Bangladesh) “Introduction of PV-diesel Hybrid System at Fastening Manufacturing Plant” (27 December 2017 to 25 January 2018) |
Bangladesh |
27 Dec 17 |
Decision by the JC |
Indonesia |
22 Dec 17 |
Call for public inputs on a proposed JCM project (Bangladesh) “Installation of High Efficiency Loom at Weaving Factory” (22 December 2017 to 20 January 2018) |
Bangladesh |
22 Dec 17 |
2nd Joint Committee in Santiago |
Chile |
19 Dec 17 |
Call for public inputs on a proposed JCM project (Viet Nam) “Introduction of Energy-Efficient Air Conditioners in RICOH IMAGING PRODUCTS (Vietnam) CO., LTD” (16 December 2017 to 14 January 2018) |
Viet Nam |
16 Dec 17 |
Call for public comments on a proposed JCM project (Indonesia) “Power generation by waste heat recovery in the PT Semen Indonesia (Persero) Tbk factory in Tuban” (13 December 2017 to 11 January 2018) |
Indonesia |
13 Dec 17 |
Call for public inputs on proposed JCM projects (Viet Nam) “Introduction of Solar PV System at shopping mall in Ho Chi Minh” and “Introduction of Amorphous High Efficiency Transformers in Southern and Central Power Grids” (8 December 2017 to 6 January 2018) |
Viet Nam |
08 Dec 17 |