News :
Call for public inputs on a JCM proposed methodology "Installation of Energy Management System and Battery Energy Storage System (EMS-BESS) with Solar PV System" (Maldives) (9 to 23 July 2020)

09 Jul 20

*This call for public inputs has been closed.
Information on the proposed methodology (MV_PM002)