| ID_PM045 | 
        Installation of gas engine cogeneration system with absorption chiller to supply electricity, heating energy and cooling energy | 
          Approved | 
        
         | 
      
      
        | ID_PM044 | 
        Installation of closed drain recovery system and utilization for boiler feed water | 
          Approved | 
        
            10 Dec 21   -   24 Dec 21
         | 
      
      
        | ID_PM043 | 
        Introducing double-bundle modular electric heat pumps to a new building | 
          Approved | 
        
            17 Mar 21   -   31 Mar 21
         | 
      
      
        | ID_PM042 | 
        Installation of a separate type fridge-freezer showcase by using natural refrigerant for grocery store to reduce air conditioning load inside the store | 
          Approved | 
        
            17 Mar 21   -   31 Mar 21
         | 
      
      
        | ID_PM041 | 
        Installation of LED Lighting for Grocery Store | 
          Approved | 
        
            17 Mar 21   -   31 Mar 21
         | 
      
      
        | ID_PM040 | 
        Installation of Inverter-Type Air Conditioning System for Cooling for Grocery Store | 
          Approved | 
        
            17 Mar 21   -   31 Mar 21
         | 
      
      
        | ID_PM039 | 
        Energy Saving by Introduction of High Efficiency Centrifugal Chiller | 
          Approved | 
        
            17 Mar 21   -   31 Mar 21
         | 
      
      
        | ID_PM038 | 
        Energy saving by introducing waste hot water recovery system to autoclave in infusion manufacturing process line | 
          Approved | 
        
            23 Dec 20   -   06 Jan 21
         | 
      
      
        | ID_PM037 | 
        Electricity generation by a biomass power plant | 
          Approved | 
        
            23 Dec 20   -   06 Jan 21
         | 
      
      
        | ID_PM036 | 
        Introduction of CNG-Diesel Hybrid Equipment to Public Buses | 
          Approved | 
        
            14 Sep 20   -   28 Sep 20
         | 
      
      
        | ID_PM035 | 
        Installation of all-electric injection molding machine with power regeneration | 
          Approved | 
        
            03 Sep 20   -   17 Sep 20
         | 
      
      
        | ID_PM034 | 
        Replacement of diffuser with aerator in aeration pond | 
          Approved | 
        
            12 May 20   -   26 May 20
         | 
      
      
        | ID_PM033 | 
        Installation of gas engine cogeneration system with absorption chiller to supply electricity, heating energy and cooling energy | 
          Approved | 
        
            12 May 20   -   26 May 20
         | 
      
      
        | ID_PM032 | 
        Introduction of Absorption Chiller | 
          Approved | 
        
            11 Oct 19   -   25 Oct 19
         | 
      
      
        | ID_PM031 | 
        Electricity generation by rehabilitation of run-of-river hydro power generation system(s) in Indonesia | 
          Approved | 
        
            20 Sep 19   -   04 Oct 19
         | 
      
      
        | ID_PM030 | 
        Introduction of energy efficient and high color rendering LED downlight/spotlight | 
          Approved | 
        
            29 Aug 19   -   12 Sep 19
         | 
      
      
        | ID_PM029 | 
        GHG emission reductions through optimization of refinery plant operation in Indonesia | 
          Approved | 
        
         | 
      
      
        | ID_PM028 | 
        Electricity generation by installation of run-of-river hydro power generation system(s) in Indonesia | 
          Approved | 
        
            25 Mar 19   -   08 Apr 19
         | 
      
      
        | ID_PM027 | 
        Installation of LED Street Lighting with Lighting Control System | 
          Approved | 
        
            21 Nov 18   -   05 Dec 18
         | 
      
      
        | ID_PM026 | 
        GHG emission reductions through optimization of boiler operation in Indonesia | 
          Approved | 
        
         | 
      
      
        | ID_PM025 | 
        Replacement of conventional burners with regenerative burners for aluminum holding furnaces | 
          Approved | 
        
            03 Jul 18   -   17 Jul 18
         | 
      
      
        | ID_PM024 | 
        Installation of Solar PV System and Storage Battery System | 
          Approved | 
        
            23 Jun 18   -   07 Jul 18
         | 
      
      
        | ID_PM023 | 
        Installation of gas engine cogeneration system to supply electricity and heat to facility | 
          Approved | 
        
            03 Apr 18   -   17 Apr 18
         | 
      
      
        | ID_PM022 | 
        Energy Saving by Introduction of High Efficiency Once-through Boiler | 
          Approved | 
        
            03 Apr 18   -   17 Apr 18
         | 
      
      
        | ID_PM021 | 
        Installation of Tribrid Systems to mobile communication’s Base Transceiver Stations | 
          Approved | 
        
            20 Oct 17   -   03 Nov 17
         | 
      
      
        | ID_PM020 | 
        Installation of Solar PV System | 
          Approved | 
        
            20 Oct 17   -   03 Nov 17
         | 
      
      
        | ID_PM019 | 
        GHG emission reductions through optimization of refinery plant operation in Indonesia | 
          Approved | 
        
            13 May 17   -   27 May 17
         | 
      
      
        | ID_PM018 | 
        Installation of energy saving air jet loom at textile factory | 
          Approved | 
        
            13 May 16   -   27 May 16
         | 
      
      
        | ID_PM017 | 
        Replacement of conventional burners with regenerative burners for aluminum holding furnaces | 
          Approved | 
        
            14 Apr 16   -   28 Apr 16
         | 
      
      
        | ID_PM016 | 
        Reduction of Energy Consumption by Introducing an Energy-Efficient Old Corrugated Carton Processing System into a Cardboard Factory | 
          Approved | 
        
            12 Apr 16   -   26 Apr 16
         | 
      
      
        | ID_PM015 | 
        Installation of a separate type fridge-freezer showcase by using natural refrigerant for grocery store to reduce air conditioning load inside the store | 
          Approved | 
        
            09 Oct 15   -   23 Oct 15
         | 
      
      
        | ID_PM014 | 
        Installation of LED Lighting for Grocery Store | 
          Approved | 
        
            09 Oct 15   -   23 Oct 15
         | 
      
      
        | ID_PM013 | 
        Installation of Inverter-Type Air Conditioning System for Cooling for Grocery Store | 
          Approved | 
        
            09 Oct 15   -   23 Oct 15
         | 
      
      
        | ID_PM012 | 
        Installation of Energy-efficient Refrigerators Using Natural Refrigerant at Food Industry Cold Storage and Frozen Food Processing Plant | 
          Approved | 
        
            09 Oct 15   -   23 Oct 15
         | 
      
      
        | ID_PM011 | 
        Energy Saving by Introduction of High Efficiency Centrifugal Chiller | 
          Approved | 
        
            09 Oct 15   -   23 Oct 15
         | 
      
      
        | ID_PM010 | 
        Introducing double-bundle modular electric heat pumps to a new building | 
          Approved | 
        
            01 May 15   -   15 May 15
         | 
      
      
        | ID_PM009 | 
        Replacement of conventional burners with regenerative burners for aluminum holding furnaces | 
          Approved | 
        
            01 May 15   -   15 May 15
         | 
      
      
        | ID_PM008 | 
        Installation of a separate type fridge-freezer showcase by using natural refrigerant for grocery store to reduce air conditioning load inside the store | 
          Approved | 
        
            01 May 15   -   15 May 15
         | 
      
      
        | ID_PM007 | 
        GHG emission reductions through optimization of boiler operation in Indonesia | 
          Approved | 
        
            16 Oct 14   -   30 Oct 14
         | 
      
      
        | ID_PM006 | 
        GHG emission reductions through optimization of refinery plant operation in Indonesia | 
          Approved | 
        
            16 Oct 14   -   30 Oct 14
         | 
      
      
        | ID_PM005 | 
        Installation of Inverter-Type Air Conditioning System for Cooling for Grocery Store | 
          Approved | 
        
            10 Sep 14   -   24 Sep 14
         | 
      
      
        | ID_PM004 | 
        Installation of LED Lighting for Grocery Store | 
          Approved | 
        
            10 Sep 14   -   24 Sep 14
         | 
      
      
        | ID_PM003 | 
        Installation of Energy-efficient Refrigerators Using Natural Refrigerant at Food Industry Cold Storage and Frozen Food Processing Plant | 
          Approved | 
        
            10 Sep 14   -   24 Sep 14
         | 
      
      
        | ID_PM002 | 
        Energy Saving by Introduction of High Efficiency Centrifugal Chiller | 
          Approved | 
        
            01 May 14   -   15 May 14
         | 
      
      
        | ID_PM001 | 
        Power Generation by Waste Heat Recovery in Cement Industry | 
          Approved | 
        
            01 May 14   -   15 May 14
         |