ID_PM045 |
Installation of gas engine cogeneration system with absorption chiller to supply electricity, heating energy and cooling energy |
Approved |
|
ID_PM044 |
Installation of closed drain recovery system and utilization for boiler feed water |
Approved |
10 Dec 21 - 24 Dec 21
|
ID_PM043 |
Introducing double-bundle modular electric heat pumps to a new building |
Approved |
17 Mar 21 - 31 Mar 21
|
ID_PM042 |
Installation of a separate type fridge-freezer showcase by using natural refrigerant for grocery store to reduce air conditioning load inside the store |
Approved |
17 Mar 21 - 31 Mar 21
|
ID_PM041 |
Installation of LED Lighting for Grocery Store |
Approved |
17 Mar 21 - 31 Mar 21
|
ID_PM040 |
Installation of Inverter-Type Air Conditioning System for Cooling for Grocery Store |
Approved |
17 Mar 21 - 31 Mar 21
|
ID_PM039 |
Energy Saving by Introduction of High Efficiency Centrifugal Chiller |
Approved |
17 Mar 21 - 31 Mar 21
|
ID_PM038 |
Energy saving by introducing waste hot water recovery system to autoclave in infusion manufacturing process line |
Approved |
23 Dec 20 - 06 Jan 21
|
ID_PM037 |
Electricity generation by a biomass power plant |
Approved |
23 Dec 20 - 06 Jan 21
|
ID_PM036 |
Introduction of CNG-Diesel Hybrid Equipment to Public Buses |
Approved |
14 Sep 20 - 28 Sep 20
|
ID_PM035 |
Installation of all-electric injection molding machine with power regeneration |
Approved |
03 Sep 20 - 17 Sep 20
|
ID_PM034 |
Replacement of diffuser with aerator in aeration pond |
Approved |
12 May 20 - 26 May 20
|
ID_PM033 |
Installation of gas engine cogeneration system with absorption chiller to supply electricity, heating energy and cooling energy |
Approved |
12 May 20 - 26 May 20
|
ID_PM032 |
Introduction of Absorption Chiller |
Approved |
11 Oct 19 - 25 Oct 19
|
ID_PM031 |
Electricity generation by rehabilitation of run-of-river hydro power generation system(s) in Indonesia |
Approved |
20 Sep 19 - 04 Oct 19
|
ID_PM030 |
Introduction of energy efficient and high color rendering LED downlight/spotlight |
Approved |
29 Aug 19 - 12 Sep 19
|
ID_PM029 |
GHG emission reductions through optimization of refinery plant operation in Indonesia |
Approved |
|
ID_PM028 |
Electricity generation by installation of run-of-river hydro power generation system(s) in Indonesia |
Approved |
25 Mar 19 - 08 Apr 19
|
ID_PM027 |
Installation of LED Street Lighting with Lighting Control System |
Approved |
21 Nov 18 - 05 Dec 18
|
ID_PM026 |
GHG emission reductions through optimization of boiler operation in Indonesia |
Approved |
|
ID_PM025 |
Replacement of conventional burners with regenerative burners for aluminum holding furnaces |
Approved |
03 Jul 18 - 17 Jul 18
|
ID_PM024 |
Installation of Solar PV System and Storage Battery System |
Approved |
23 Jun 18 - 07 Jul 18
|
ID_PM023 |
Installation of gas engine cogeneration system to supply electricity and heat to facility |
Approved |
03 Apr 18 - 17 Apr 18
|
ID_PM022 |
Energy Saving by Introduction of High Efficiency Once-through Boiler |
Approved |
03 Apr 18 - 17 Apr 18
|
ID_PM021 |
Installation of Tribrid Systems to mobile communication’s Base Transceiver Stations |
Approved |
20 Oct 17 - 03 Nov 17
|
ID_PM020 |
Installation of Solar PV System |
Approved |
20 Oct 17 - 03 Nov 17
|
ID_PM019 |
GHG emission reductions through optimization of refinery plant operation in Indonesia |
Approved |
13 May 17 - 27 May 17
|
ID_PM018 |
Installation of energy saving air jet loom at textile factory |
Approved |
13 May 16 - 27 May 16
|
ID_PM017 |
Replacement of conventional burners with regenerative burners for aluminum holding furnaces |
Approved |
14 Apr 16 - 28 Apr 16
|
ID_PM016 |
Reduction of Energy Consumption by Introducing an Energy-Efficient Old Corrugated Carton Processing System into a Cardboard Factory |
Approved |
12 Apr 16 - 26 Apr 16
|
ID_PM015 |
Installation of a separate type fridge-freezer showcase by using natural refrigerant for grocery store to reduce air conditioning load inside the store |
Approved |
09 Oct 15 - 23 Oct 15
|
ID_PM014 |
Installation of LED Lighting for Grocery Store |
Approved |
09 Oct 15 - 23 Oct 15
|
ID_PM013 |
Installation of Inverter-Type Air Conditioning System for Cooling for Grocery Store |
Approved |
09 Oct 15 - 23 Oct 15
|
ID_PM012 |
Installation of Energy-efficient Refrigerators Using Natural Refrigerant at Food Industry Cold Storage and Frozen Food Processing Plant |
Approved |
09 Oct 15 - 23 Oct 15
|
ID_PM011 |
Energy Saving by Introduction of High Efficiency Centrifugal Chiller |
Approved |
09 Oct 15 - 23 Oct 15
|
ID_PM010 |
Introducing double-bundle modular electric heat pumps to a new building |
Approved |
01 May 15 - 15 May 15
|
ID_PM009 |
Replacement of conventional burners with regenerative burners for aluminum holding furnaces |
Approved |
01 May 15 - 15 May 15
|
ID_PM008 |
Installation of a separate type fridge-freezer showcase by using natural refrigerant for grocery store to reduce air conditioning load inside the store |
Approved |
01 May 15 - 15 May 15
|
ID_PM007 |
GHG emission reductions through optimization of boiler operation in Indonesia |
Approved |
16 Oct 14 - 30 Oct 14
|
ID_PM006 |
GHG emission reductions through optimization of refinery plant operation in Indonesia |
Approved |
16 Oct 14 - 30 Oct 14
|
ID_PM005 |
Installation of Inverter-Type Air Conditioning System for Cooling for Grocery Store |
Approved |
10 Sep 14 - 24 Sep 14
|
ID_PM004 |
Installation of LED Lighting for Grocery Store |
Approved |
10 Sep 14 - 24 Sep 14
|
ID_PM003 |
Installation of Energy-efficient Refrigerators Using Natural Refrigerant at Food Industry Cold Storage and Frozen Food Processing Plant |
Approved |
10 Sep 14 - 24 Sep 14
|
ID_PM002 |
Energy Saving by Introduction of High Efficiency Centrifugal Chiller |
Approved |
01 May 14 - 15 May 14
|
ID_PM001 |
Power Generation by Waste Heat Recovery in Cement Industry |
Approved |
01 May 14 - 15 May 14
|