ID024 |
Introduction of Absorption Chiller to Chemical Factory |
Project registered |
30 Mar 20 |
592 |
ID023 |
Installation of Solar Power System and Storage Battery to Commercial Facility |
Project registered |
17 Feb 21 |
260 |
ID022 |
Introduction of High Efficiency Once-through Boiler in Golf Ball Factory |
Project registered |
03 Sep 19 |
131 |
ID021 |
Introduction of High-efficiency Once-through Boiler in Film Factory |
Project registered |
31 Oct 19 |
738 |
ID020 |
Introduction of High-Efficiency Looms in Weaving Mill |
Project registered |
03 Sep 19 |
376 |
ID019 |
Installation of gas engine cogeneration system to supply electricity and heat to the vehicle manufacturing factory of PT. Toyota Motor Manufacturing Indonesia |
Project registered |
09 May 19 |
19,613 |
ID018 |
1.6MW Solar PV Power Plant Project in Jakabaring Sport City |
Project registered |
07 Mar 19 |
899 |
ID017 |
Introduction of 0.5MW Solar Power System to Aroma and Food Ingredients Factory |
Project registered |
07 Mar 19 |
369 |
ID016 |
Installation of Tribrid System to mobile communication’s Base Transceiver Stations in Republic of Indonesia |
Project registered |
10 Jul 18 |
359 |
ID015 |
Reducing GHG emission at textile factories by upgrading to air-saving loom |
Project registered |
24 Aug 18 |
742 |
ID014 |
Energy saving by optimum operation at an oil refinery |
Project registered |
10 Jul 18 |
1,275 |
ID013 |
Power generation by waste heat recovery in the PT Semen Indonesia (Persero) Tbk factory in Tuban |
Project registered |
10 Jul 18 |
132,500 |
ID012 |
GHG emission reductions through utility facility operation optimization system for refineries in the Republic of Indonesia |
Project registered |
10 Jul 18 |
20,000 |
ID011 |
Reduction of Energy Consumption by Introducing an Energy-Efficient Waste Paper Processing System into a Packaging Paper Factory in Bekasi, West Java |
Project registered |
22 Dec 17 |
17,822 |
ID010 |
Energy saving through introduction of Regenerative Burners for aluminum holding furnaces of the automotive components manufacture in the Republic of Indonesia |
Project registered |
30 Mar 20 |
78 |
ID009 |
Energy Saving for Air-Conditioning at Shopping Mall with High Efficiency Centrifugal Chiller |
Project registered |
04 Dec 17 |
325 |
ID008 |
Introducing double-bundle modular electric heat pumps at AXIA SOUTH CIKARANG Tower 2 |
Project registered |
10 Feb 17 |
166 |
ID006 |
Installation of Inverter-type Air Conditioning System, LED Lighting and Separate Type Fridge Freezer Showcase to Grocery Stores in Republic of Indonesia |
Project registered |
03 Jun 16 |
115 |
ID005 |
Energy Saving for Air-Conditioning at Textile Factory by Introducing High-efficiency Centrifugal Chiller in Batang, Central Java (Phase 2) |
Project registered |
24 Mar 16 |
145 |
ID004 |
Energy Saving for Air-Conditioning at Textile Factory by Introducing High-efficiency Centrifugal Chiller in Karawang West Java |
Project registered |
24 Mar 16 |
176 |
ID003 |
Project of Introducing High Efficiency Refrigerator to a Frozen Food Processing Plant in Indonesia |
Project registered |
29 Mar 15 |
21 |
ID002 |
Project of Introducing High Efficiency Refrigerator to a Food Industry Cold Storage in Indonesia |
Project registered |
29 Mar 15 |
120 |
ID001 |
Energy Saving for Air-Conditioning and Process Cooling by Introducing High-efficiency Centrifugal Chiller |
Project registered |
31 Oct 14 |
114 |