Project : ID008 Introducing double-bundle modular electric heat pumps at AXIA SOUTH CIKARANG Tower 2

Project title Introducing double-bundle modular electric heat pumps at AXIA SOUTH CIKARANG Tower 2
Ref No. ID008
PDD form
Monitoring plan

SDIP
MoC(PDF) MoC
Name of project participants (Indonesia) PT. TTL Residences
Name of project participants (Japan) Toyota Tsusho Corporation.
Name of third party entity (TPE) TPE-ID-003 Japan Quality Assurance Organization
Location of project Country: The Republic of Indonesia
Region/State/Province etc: West Java Province
City/Town/Community etc: JL. PAJAJARAN NO.7 DESA SUKARESMI, LIPPO CIKARANG BEKASI 17550
Latitude, longitude:

S06°19'40.5660", E107°08'02.3028"

Duration Starting date of project operation: 01 Apr 16
Expected operational lifetime of project: 8years
Methodology No.
Emission Reductions (tCO2e) Estimated emission reductions in each year
  • - (in 2013)
  • - (in 2014)
  • - (in 2015)
  • 131 (in 2016)
  • 175 (in 2017)
  • 175 (in 2018)
  • 175 (in 2019)
  • 175 (in 2020)
Status Project registered
Public comments
  • 06 Aug 16  -  04 Sep 16
Registration