Total projects found: 4
Reference number | Project title | Status | Registration date | Emission Reductions (Average) |
---|---|---|---|---|
ID031 | Installation of Aerator for Industrial Wastewater Treatment Facility in Rubber Factory | Validation | 303 | |
ID030 | Installation of all-electric injection molding machine with power regeneration to plastics & packaging manufacturing plants | Validation | 2,642 | |
ID028 | Introduction of Gas Co-generation System and Absorption Chiller to Motor Parts Factory | Validation | 3,644 | |
ID007 | Energy saving through introduction of Regenerative Burners for aluminum holding furnaces of the automotive components manufacture in the Republic of Indonesia | Request for Registration withdrawn | 23 |