Request for registration

Total projects found: 4

Reference number Project title Status Registration date Emission Reductions (Average)
ID031 Installation of Aerator for Industrial Wastewater Treatment Facility in Rubber Factory Validation 303
ID030 Installation of all-electric injection molding machine with power regeneration to plastics & packaging manufacturing plants Validation 2,642
ID028 Introduction of Gas Co-generation System and Absorption Chiller to Motor Parts Factory Validation 3,644
ID007 Energy saving through introduction of Regenerative Burners for aluminum holding furnaces of the automotive components manufacture in the Republic of Indonesia Request for Registration withdrawn 23