Request for registration(advanced)

Total projects found: 8

Reference number Project title Status Registration date Emission Reductions (Average)
ID039 Introduction of 3.1MW Rooftop Solar Power System to Fast-Moving Consumer Goods and Printing Factories in Java Island Validation 2,594
ID038 Introduction of High-efficiency Once-through Boiler System to Chemical Factory Validation 1,317
ID037 6MW Mini Hydro Power Plant Project in West Pasaman, West Sumatra Validation 16,275
ID036 Introduction of 2.1MW Rooftop Solar Power System in Woodworking Factories Validation 1,536
ID031 Installation of Aerator for Industrial Wastewater Treatment Facility in Rubber Factory Validation 303
ID030 Installation of all-electric injection molding machine with power regeneration to plastics & packaging manufacturing plants Validation 2,642
ID028 Introduction of Gas Co-generation System and Absorption Chiller to Motor Parts Factory Validation 3,644
ID007 Energy saving through introduction of Regenerative Burners for aluminum holding furnaces of the automotive components manufacture in the Republic of Indonesia Request for Registration withdrawn 23