Project : ID038 Introduction of High-efficiency Once-through Boiler System to Chemical Factory

Project title Introduction of High-efficiency Once-through Boiler System to Chemical Factory
Ref No. ID038
PDD form
Monitoring plan
Name of project participants (Indonesia) PT. DIC GRAPHICS
Name of project participants (Japan) DIC Corporation
Name of third party entity (TPE) TPE-ID-011 PT. MUTUAGUNG LESTARI
Location of project Country: Republic of Indonesia
Region/State/Province etc: West Java Province
City/Town/Community etc: Jl. Anggadita Raya No.207 Klari, Karawang 41371, Karawang Regency
Latitude, longitude:

S 6°21'06.23" and E 107°19'56.61"

Duration Starting date of project operation: 01 Jun 23
Expected operational lifetime of project: 8 years
Methodology No.
Emission Reductions (tCO2e) Estimated emission reductions in each year
  • - (in 2013)
  • - (in 2014)
  • - (in 2015)
  • - (in 2016)
  • - (in 2017)
  • - (in 2018)
  • - (in 2019)
  • - (in 2020)
  • - (in 2021)
  • - (in 2022)
  • 661 (in 2023)
  • 1,411 (in 2024)
  • 1,411 (in 2025)
  • 1,411 (in 2026)
  • 1,411 (in 2027)
  • 1,411 (in 2028)
  • 1,411 (in 2029)
  • 1,411 (in 2030)
Status Validation
Public comments
  • 04 Feb 25  -  05 Mar 25