9th Joint Committee in Hanoi and Online |
31 Oct 24 |
Meeting Report
|
|
Decision on issuance of credits:
|
|
- VN007 “Introduction of Solar PV System at shopping mall in Ho Chi Minh” for the monitoring period of 01 Jul 16 - 31 Oct 18
|
|
- VN010 “Installation of Container Formation Facility at Lead Acid Battery Factory of Hitachi Chemical Energy Technology (Vietnam) Co., Ltd.” for the monitoring period of 01 Apr 18 - 30 Jun 19
|
|
- VN011 “Installation of Energy Saving Equipment in Lens Factory” for the monitoring period of 01 Dec 17 - 31 Jul 19
|
|
- VN013 “Introduction of Amorphous High Efficiency Transformers in Northern, Central and Southern Power Grids” for the monitoring period of 01 Jan 18 - 31 Dec 20
|
|
- VN014 “Introduction of high-efficient wire stranding machines to the factory of YAZAKI EDS VIETNAM Co., LTD.” for the monitoring period of 01 Nov 18 - 30 Jun 19
|
|
- VN004 “Introduction of amorphous high efficiency transformers in power distribution systems in the southern part of Viet Nam” for the monitoring period of 01 Apr 16 - 31 Dec 20
|
|
- VN008 “Introduction of Amorphous High Efficiency Transformers in Southern and Central Power Grids” for the monitoring period of 01 Jan 18 - 31 Dec 20
|
|
- VN009 “Introduction of Energy-Efficient Air Conditioners in RICOH IMAGING PRODUCTS (Vietnam) CO., LTD” for the monitoring period of 01 Dec 18 - 31 Dec 20
|
|
- VN001 “Eco-Driving by Utilizing Digital Tachograph System” for the monitoring period of 01 Jul 16 - 30 Sep 17
|
|
Decision by the Joint Committee (Electronic Decision) |
11 Oct 19 |
Decision on issuance of credits:
|
|
- VN008 "Introduction of Amorphous High Efficiency Transformers in Southern and Central Power Grids" for the monitoring period of 13 May 17 - 31 Dec 17
|
|
- VN009 "Introduction of Energy-Efficient Air Conditioners in RICOH IMAGING PRODUCTS (Vietnam) CO., LTD" for the monitoring period of 06 Dec 17 - 30 Nov 18
|
|
Decision by the Joint Committee (Electronic Decision) |
19 Jul 19 |
Decision on issuance of credits
|
|
- VN006 “Energy saving and work efficiency improvement by introducing a new chip-on-board LED system in Vietnam” for the monitoring period of 24 Mar 17 – 31 Dec 17
|
|
Designation of a TPE for an additional sectoral scope of 12 for validation and verification:
|
|
- EPIC Sustainability Services Private Limited (EPIC)
|
|
8th Joint Committee in Hanoi |
28 May 19 |
Meeting Report
|
|
Annex 1: VN_AM015 (version 01.0) "Installation of compressor control system(s) for split type air conditioner(s)"
|
|
Registration of proposed JCM projects:
|
|
- VN010 "Installation of Container Formation Facility at Lead Acid Battery Factory of Hitachi Chemical Energy Technology (Vietnam) Co., Ltd."
|
|
- VN011 "Installation of Energy Saving Equipment in Lens Factory"
|
|
- VN012 "Introduction of High Efficiency Water Pumps in Da Nang City"
|
|
- VN013 "Introduction of Amorphous High Efficiency Transformers in Northern, Central and Southern Power Grids"
|
|
- VN014 "Introduction of high-efficient wire stranding machines to the factory of YAZAKI EDS VIETNAM Co., LTD."
|
|
Decision on issuance of credits:
|
|
- VN005 "Introduction of High Efficiency Air-conditioning in Hotel" for the monitoring period of 06 Oct 16 - 30 Sep 17
|
|
Decision by the Joint Committee |
29 Aug 18 |
Approval of proposed methodologies:
|
|
VN_AM010 "Introduction of tunnel and/or shuttle kiln with waste heat recovery system"
|
|
VN_AM011 "Energy Saving by Introduction of High Efficiency Inverter Type Centrifugal Chiller"
|
|
VN_AM012 "Energy Saving by Introduction of Heat Recovery Electric Heat Pump"
|
|
VN_AM013 "Energy saving by introduction of high-efficiency double suction volute pumps in water supply system"
|
|
VN_AM014 "Introduction of energy efficient wire stranding machines to automotive wire production factory"
|
|
7th Joint Committee in Hanoi |
15 Aug 18 |
Meeting Report
|
|
Annex 1: VN_AM009 (version 01.1) “Installation of Container Formation Facility at Lead Acid Battery Factory"
|
|
Registration of proposed JCM projects:
|
|
- VN006 "Energy saving and work efficiency improvement by introducing a new chip-on-board LED system in Vietnam"
|
|
- VN007 "Introduction of Solar PV System at shopping mall in Ho Chi Minh"
|
|
- VN008 "Introduction of Amorphous High Efficiency Transformers in Southern and Central Power Grids"
|
|
- VN009 "Introduction of Energy-Efficient Air Conditioners in RICOH IMAGING PRODUCTS (Vietnam) CO., LTD"
|
|
Decision on issuance of credits:
|
|
- VN002 "Promotion of green hospitals by improving efficiency / environment in national hospitals in Vietnam" for the monitoring period of 06 Aug 15 - 31 Oct 16
|
|
- VN003 "Low carbon hotel project in Vietnam: Improving the energy efficiency of commercial buildings by utilization of high efficiency equipment" for the monitoring period of 01 Apr 16 - 31 May 17
|
|
6th Joint Committee in Hanoi |
10 Oct 17 |
Meeting Report
|
|
Annex 1: Joint Crediting Mechanism Project Cycle Procedure (version 04.0)
|
|
Annex 2: VN_AM007 “Installation of Solar PV System”
|
|
Annex 3: VN_AM008 “Installation of LED lighting equipment to fishing boats”
|
|
Annex 4: VN_AM009 “Installation of Container Formation Facility at Lead Acid Battery Factory”
|
|
Registration of a proposed JCM project:
|
|
- VN005 "Introduction of High Efficiency Air-conditioning in Hotel"
|
|
Decision on issuance of credits:
|
|
- VN004 "Introduction of amorphous high efficiency transformers in power distribution systems in the southern part of Viet Nam" for the monitoring period of 01 Jan 16 - 31 Mar 16
|
|
- VN001 "Eco-Driving by Utilizing Digital Tachograph System" for the monitoring period of 01 Aug 15 - 30 Jun 16
|
|
Designation of a TPE for additional sectoral scopes of 1, 2 and 3 for verification:
|
|
- Japan Management Association
|
|
Decision by the Joint Committee (Electronic Decision) |
24 Feb 17 |
Aproval of request for post-registration changes:
|
|
-VN001: “Eco-Driving by Utilizing Digital Tachograph System”
|
|
5th Joint Committee in Hanoi |
20 Oct 16 |
Meeting Report
|
|
Annex 1: Guidance for the Implementation of the Joint Crediting Mechanism (JCM) (version 02.0)
|
|
Annex 2: JCM Project Cycle Procedure (version 03.0)
|
|
Annex 2.1. JCM Credits Issuance Request Form (version 02.0)
|
|
Annex 2.2. JCM Modalities of Communication Statement Form (version 02.0)
|
|
Annex 2.3. JCM Verification Report Form (version 02.0)
|
|
Annex 3: JCM Guidelines for Developing Proposed Methodology (version 02.0)
|
|
Annex 4: JCM Guidelines for Developing Project Design Document and Monitoring Report (version 02.0)
|
|
Annex 5: JCM Guidelines for Designation as a Third-Party Entity (version 03.0)
|
|
Annex 6: Common Specifications of the JCM Registry
|
|
Annex 7: VN_AM006 “Introduction of air conditioning system equipped with inverters”
|
|
Annex 8: VN_AM001 (version 02.0) “Transportation energy efficiency activities by installing digital tachograph systems”
|
|
Decision by the Joint Committee (Electronic Decision) |
15 May 16 |
Registration of proposed JCM projects:
|
|
-VN003 "Low carbon hotel project in Vietnam: Improving the energy efficiency of commercial buildings by utilization of high efficiency equipment"
|
|
-VN004 "Introduction of amorphous high efficiency transformers in power distribution systems in the southern part of Viet Nam"
|
|
Decision by the Joint Committee (Electronic Decision) |
30 Nov 15 |
Registration of a proposed JCM project:
|
|
-VN002 "Promotion of green hospitals by improving efficiency / environment in national hospitals in Vietnam"
|
|
Decision by the Joint Committee |
03 Sep 15 |
Approval of a proposed methodology:
|
|
VN_AM005 "Installation of energy efficient transformers in a power distribution grid"
|
|
4th Joint Committee in Hanoi |
04 Aug 15 |
Meeting Report
|
|
Annex 1: VN_AM004 “Anaerobic digestion of organic waste for biogas utilization within wholesale markets”
|
|
Registration of proposed JCM projects:
|
|
-VN001 "Eco-Driving by Utilizing Digital Tachograph System"
|
|
Decision by the Joint Committee (Electronic Decision) |
31 May 15 |
Designation of third-party entities:
|
|
- KBS Certification Services Pvt. Ltd.
|
|
Decision by the Joint Committee (Electronic Decision) |
29 Mar 15 |
Joint Crediting Mechanism Rules of Procedures for the Joint Committee ver03.0
|
|
Joint Crediting Mechanism Project Cycle Procedure ver02.0
|
|
Joint Crediting Mechanism Guidelines for Designation as a Third-Party Entity ver02.0
|
|
Designation of third-party entities:
|
|
- TUV Rheinland (China) Ltd
|
|
- EPIC Sustainability Services Private Limited (EPIC)
|
|
3rd Joint Committee in Hanoi |
14 Jan 15 |
Meeting Report
|
|
Annex 1: VN_AM001 “Transportation energy efficiency activities by installing digital tachograph systems”
|
|
Annex 2: Comments on VN_PM002 "Waste heat recovery for electricity generation"
|
|
Annex 3: VN_AM002 “Introduction of Room Air Conditioners Equipped with Inverters”
|
|
Annex 4: VN_AM003 “Improving the Energy Efficiency of Commercial Buildings by Utilization of High Efficiency Equipment”
|
|
Decision by the Joint Committee (Electronic Decision) |
27 May 14 |
Designation of third-party entities:
|
|
- Japan Management Association
|
|
- TÜV SÜD South Asia Private Limited
|
|
- Deloitte Tohmatsu Evaluation and Certification Organization Co., Ltd
|
|
Joint Crediting Mechanism Rules of Procedures for the Joint Committee ver02.0
|
|
Decision by the Joint Committee (Electronic Decision) |
23 Apr 14 |
Designation of third-party entities:
|
|
- Lloyd’s Register Quality Assurance Limited
|
|
- Japan Quality Assurance Organization
|
|
2nd Joint Committee in Tokyo |
17 Feb 14 |
Meeting Report
|
|
Annex 1: Joint Crediting Mechanism Project Cycle Procedure
|
|
Annex 1.1. JCM Modalities of Communication Statement Form
|
|
Annex 1.2. JCM Validation Report Form
|
|
Annex 1.3. JCM Project Registration Request Form
|
|
Annex 1.4. JCM Verification Report Form
|
|
Annex 1.5. JCM Credits Issuance Request Form
|
|
Annex 1.6. JCM Approved Methodology Revision Request Form
|
|
Annex 1.7. JCM Post-Registration Changes Request Form
|
|
Annex 1.8. JCM Project Withdrawal Request Form
|
|
Annex 1.9. JCM Registration Request Withdrawal Form
|
|
Annex 1.10. JCM Issuance Request Withdrawal Form
|
|
Annex 2: Joint Crediting Mechanism Guidelines for Developing Proposed Methodology
|
|
Annex 3: Joint Crediting Mechanism Guidelines for Developing Project Design Document and Monitoring Report
|
|
Annex 4: Joint Crediting Mechanism Guidelines for Designation of a Third-Party Entity
|
|
Annex 5: Joint Crediting Mechanism Guidelines for Validation and Verification
|
|
Annex 6: Joint Crediting Mechanism Glossary of Terms
|
|
1st Joint Committee in Hanoi |
18 Sep 13 |
Meeting Report
|
|
Signing Ceremony for adoption of the "Guidance for the Implementation of the Joint Crediting Mechanism" and the "Joint Crediting Mechanism Rules of Procedures for the Joint Committee" |
18 Sep 13 |
Cover letter
|
|
Guidance for the Implementation of the JCM
|
|
JCM Rules of Procedures for the Joint Committee
|
|