Call for public comments on a proposed JCM project (Indonesia) “Introduction of High-Efficiency Looms in Weaving Mill” (26 December 2018 to 24 January 2019) |
26 Dec 18 |
Call for public comments on a proposed JCM project (Indonesia) “Installation of gas engine cogeneration system to supply electricity and heat to the vehicle manufacturing factory of PT. Toyota Motor Manufacturing Indonesia” (14 December 2018 to 12 January 2019) |
14 Dec 18 |
Decision by the JC |
28 Nov 18 |
Call for public comments on JCM proposed methodology “Installation of LED Street Lighting with Lighting Control System” (Indonesia) (21 November to 5 December 2018) |
21 Nov 18 |
Decision by the JC |
24 Oct 18 |
Call for public comments on proposed JCM projects (Indonesia) “Introduction of 0.5MW Solar Power System to Aroma and Food Ingredients Factory” and “1.6MW Solar PV Power Plant Project in Jakabaring Sport City” (1 to 30 September 2018) |
01 Sep 18 |
Decision by the JC |
24 Aug 18 |
8th Joint Committee in Jakarta |
10 Jul 18 |
Call for public comments on a proposed revision to the approved methodology ID_AM009 “Replacement of conventional burners with regenerative burners for aluminum holding furnaces” (Indonesia) (3 July to 17 July 2018) |
03 Jul 18 |
Call for public comments on JCM proposed methodology “Installation of Solar PV System and Storage Battery System” (Indonesia) (23 June to 7 July 2018) |
23 Jun 18 |
Call for public comments on JCM proposed methodologies (Indonesia) “Energy Saving by Introduction of High Efficiency Once-through Boiler” and “Installation of gas engine cogeneration system to supply electricity and heat to facility” (3 April to 17 April 2018) |
03 Apr 18 |
Call for public comments on a proposed JCM project (Indonesia) “Installation of Tribrid System to mobile communication’s Base Transceiver Stations in Republic of Indonesia” (28 February to 29 March 2018) |
28 Feb 18 |
Call for public comments on a proposed JCM project (Indonesia) “Reducing GHG emission at textile factories by upgrading to air-saving loom” (6 February to 7 March 2018) |
06 Feb 18 |
Call for public comments on a proposed JCM project (Indonesia) “Energy saving by optimum operation at an oil refinery” (12 January to 10 February 2018) |
12 Jan 18 |
Decision by the JC |
22 Dec 17 |
Call for public comments on a proposed JCM project (Indonesia) “Power generation by waste heat recovery in the PT Semen Indonesia (Persero) Tbk factory in Tuban” (13 December 2017 to 11 January 2018) |
13 Dec 17 |
7th Joint Committee in Tangerang Selatan |
04 Dec 17 |
Call for public comments on JCM proposed methodologies (Indonesia) “Installation of Solar PV System”and “Installation of Tribrid Systems to mobile communication’s Base Transceiver Stations” (20 October to 3 November 2017) |
20 Oct 17 |
Call for public commments on a proposed JCM project (Indonesia) “GHG emission reductions through utility facility operation optimization system for refineries in the Republic of Indonesia” (20 October to 18 November 2017) |
20 Oct 17 |
Electronic Decision by the JC |
21 Sep 17 |