Electronic Decision by the JC |
30 Mar 20 |
Call for public comments on proposed JCM projects (Indonesia) "Installation of Solar Power System and Storage Battery to Commercial Facility" and "Introduction of Absorption Chiller to Chemical Factory" (15 January to 13 February 2020) |
15 Jan 20 |
Decision by the JC |
10 Jan 20 |
9th Joint Committee in Denpasar |
31 Oct 19 |
Call for public comments on JCM proposed methodology “Introduction of Absorption Chiller” (Indonesia) (11 to 25 October 2019) |
11 Oct 19 |
Call for public comments on JCM proposed methodology “Electricity generation by rehabilitation of run-of-river hydro power generation system(s) in Indonesia” (Indonesia) (20 September to 4 October 2019) |
20 Sep 19 |
Electronic Decision by the JC |
03 Sep 19 |
Call for public comments on JCM proposed methodology “Introduction of energy efficient and high color rendering LED downlight/spotlight” (Indonesia) (29 August to 12 September 2019) |
29 Aug 19 |
Decision by the JC |
18 Jul 19 |
Electronic Decision by the JC |
09 May 19 |
Call for public comments on a proposed JCM project (Indonesia) “Energy saving through introduction of Regenerative Burners for aluminum holding furnaces of the automotive components manufacture in the Republic of Indonesia” (11 April to 10 May 2019) |
11 Apr 19 |
Call for public comments on a proposed JCM project (Indonesia) “Introduction of High Efficiency Once-through Boiler in Golf Ball Factory” (25 March to 23 April 2019) |
25 Mar 19 |
Call for public comments on JCM proposed methodology “Electricity generation by installation of run-of-river hydro power generation system(s) in Indonesia” (Indonesia) (25 March to 8 April 2019) |
25 Mar 19 |
Electronic Decision by the JC |
07 Mar 19 |
Call for public comments on a proposed JCM project (Indonesia) “Introduction of High-efficiency Once-through Boiler in Film Factory” (19 February to 20 March 2019) |
19 Feb 19 |
Call for public comments on a proposed JCM project (Indonesia) “Introduction of High-Efficiency Looms in Weaving Mill” (26 December 2018 to 24 January 2019) |
26 Dec 18 |
Call for public comments on a proposed JCM project (Indonesia) “Installation of gas engine cogeneration system to supply electricity and heat to the vehicle manufacturing factory of PT. Toyota Motor Manufacturing Indonesia” (14 December 2018 to 12 January 2019) |
14 Dec 18 |
Decision by the JC |
28 Nov 18 |
Call for public comments on JCM proposed methodology “Installation of LED Street Lighting with Lighting Control System” (Indonesia) (21 November to 5 December 2018) |
21 Nov 18 |
Decision by the JC |
24 Oct 18 |