News :
Call for public comments on proposed JCM projects (Indonesia) "Installation of Solar Power System and Storage Battery to Commercial Facility" and "Introduction of Absorption Chiller to Chemical Factory" (15 January to 13 February 2020)

15 Jan 20

Call for public comments on proposed JCM projects (Indonesia) “Installation of Solar Power System and Storage Battery to Commercial Facility” and “Introduction of Absorption Chiller to Chemical Factory” (15 January to 13 February 2020)

The draft PDDs were submitted to the JCM secretariat between Indonesia and Japan on 27 December 2019 and 9 January 2020.
The secretariat makes the draft PDDs publicly available for public comments in line with subsection 1.6.1. of the Joint Crediting Mechanism Project Cycle Procedure.

Information on the proposed project (ID023)
Information on the proposed project (ID024)

All stakeholders are invited to provide their comments on the proposed projects to the following email address id-pdd-pi@jcm.go.jp and secretariat@jcmindonesia.com only in English, including the following information:
- Name:
- Affiliated Organization:
- E-mail:
- Country:
- Part of the document (A/B/C/etc):
- Page of the document:
- Comment on the page:

*NOTE: The secretariat makes all received comments publicly available unless the TPE determines that the comment is unauthentic in line with paragraph 42 of the Joint Crediting Mechanism Project Cycle Procedure.

This call for public comments is open from 15 January to 13 February 2020 (24:00 GMT).