News

Subject Published date
Call for public comments on a proposed JCM project (Indonesia) “Introduction of High Efficiency Once-through Boiler in Golf Ball Factory” (25 March to 23 April 2019) 25 Mar 19
Call for public comments on JCM proposed methodology “Electricity generation by installation of run-of-river hydro power generation system(s) in Indonesia” (Indonesia) (25 March to 8 April 2019) 25 Mar 19
Electronic Decision by the JC 07 Mar 19
Call for public comments on a proposed JCM project (Indonesia) “Introduction of High-efficiency Once-through Boiler in Film Factory” (19 February to 20 March 2019) 19 Feb 19
Call for public comments on a proposed JCM project (Indonesia) “Introduction of High-Efficiency Looms in Weaving Mill” (26 December 2018 to 24 January 2019) 26 Dec 18
Call for public comments on a proposed JCM project (Indonesia) “Installation of gas engine cogeneration system to supply electricity and heat to the vehicle manufacturing factory of PT. Toyota Motor Manufacturing Indonesia” (14 December 2018 to 12 January 2019) 14 Dec 18
Decision by the JC 28 Nov 18
Call for public comments on JCM proposed methodology “Installation of LED Street Lighting with Lighting Control System” (Indonesia) (21 November to 5 December 2018) 21 Nov 18
Decision by the JC 24 Oct 18
Call for public comments on proposed JCM projects (Indonesia) “Introduction of 0.5MW Solar Power System to Aroma and Food Ingredients Factory” and “1.6MW Solar PV Power Plant Project in Jakabaring Sport City” (1 to 30 September 2018) 01 Sep 18
Decision by the JC 24 Aug 18
8th Joint Committee in Jakarta 10 Jul 18
Call for public comments on a proposed revision to the approved methodology ID_AM009 “Replacement of conventional burners with regenerative burners for aluminum holding furnaces” (Indonesia) (3 July to 17 July 2018) 03 Jul 18
Call for public comments on JCM proposed methodology “Installation of Solar PV System and Storage Battery System” (Indonesia) (23 June to 7 July 2018) 23 Jun 18
Call for public comments on JCM proposed methodologies (Indonesia) “Energy Saving by Introduction of High Efficiency Once-through Boiler” and “Installation of gas engine cogeneration system to supply electricity and heat to facility” (3 April to 17 April 2018) 03 Apr 18
Call for public comments on a proposed JCM project (Indonesia) “Installation of Tribrid System to mobile communication’s Base Transceiver Stations in Republic of Indonesia” (28 February to 29 March 2018) 28 Feb 18
Call for public comments on a proposed JCM project (Indonesia) “Reducing GHG emission at textile factories by upgrading to air-saving loom” (6 February to 7 March 2018) 06 Feb 18
Call for public comments on a proposed JCM project (Indonesia) “Energy saving by optimum operation at an oil refinery” (12 January to 10 February 2018) 12 Jan 18
Decision by the JC 22 Dec 17
Call for public comments on a proposed JCM project (Indonesia) “Power generation by waste heat recovery in the PT Semen Indonesia (Persero) Tbk factory in Tuban” (13 December 2017 to 11 January 2018) 13 Dec 17