The 10th Joint Committee of the Joint Crediting Mechanism between Indonesia and Japan was held in Jakarta.
Meeting Report
Annex 1: Rules of Implementation for the JCM (version 03.0)
Annex 2: Joint Crediting Mechanism Glossary of Terms (version 03.0)
Annex 3: Common Specifications of the JCM Registry (version 02.0)
Annex 4: Joint Crediting Mechanism Project Cycle Procedure (version 06.0)
Annex 4.1: Project Idea Note for JCM Project (version 01.0)
Annex 4.2: JCM Modalities of Communication Statement Form (version 02.0)
Annex 4.3: JCM Assessment of Reference Emissions Request Form (version 01.0)
Annex 4.4: JCM Validation Report Form (version 02.0)
Annex 4.5: JCM Credit Allocation Form (version 01.0)
Annex 4.6: JCM Project Registration Request Form (version 02.0)
Annex 4.7: JCM Project Implementation Report Form (version 01.0)
Annex 4.8: JCM Verification Report Form (version 02.0)
Annex 4.9: JCM Credits Issuance Request Form (version 04.0)
Annex 4.10: JCM Renewal of Crediting Period Request Form (version 01.0)
Annex 4.11: JCM Post-Registration Changes Request Form (version 02.0)
Annex 4.12: JCM Project Withdrawal Request Form (version 02.0)
Annex 4.13: JCM Registration Request Withdrawal Form (version 02.0)
Annex 4.14: JCM Issuance Request Withdrawal Form (version 02.0)
Annex 5: Joint Crediting Mechanism Guidelines for Developing Proposed Methodology (version 03.0)
Annex 6: Joint Crediting Mechanism Guidelines for Developing Project Design Document and Monitoring Report (version 04.0)
Annex 7: Joint Crediting Mechanism Guidelines for Developing Sustainable Development Implementation Plan and Report (version 02.0)
Annex 8: Joint Crediting Mechanism Guidelines for Designation as a Third-Party Entity (version 04.0)
Annex 9: Joint Crediting Mechanism Guidelines for Validation and Verification (version 02.0)
Annex 10: Joint Crediting Mechanism Rules of Procedures for the Joint Committee (version 03.0)
Annex 10.1: Conflict of Interest Declaration Form (version 01.0)
Annex 11: Joint Crediting Mechanism Guidelines for Developing Proposed Methodology for Carbon Capture and Storage and Carbon Capture, Utilization and Storage (CCS and CCUS) (version 01.0)
Annex 12: Joint Crediting Mechanism Guidelines for Developing Project Design Document and Monitoring Report for Carbon Capture and Storage and Carbon Capture, Utilization and Storage (CCS and CCUS) (version 01.0)
Decision on issuance of credits
- ID013 “Power generation by waste heat recovery in the PT Semen Indonesia (Persero) Tbk factory in Tuban” for the monitoring period of 01 Jul 18 – 31 Dec 20
Registration of proposed JCM projects
- ID025 “Energy Saving for Industrial Park with Smart LED Street Lighting System“
- ID026 “Introduction of LED Lighting to UNIQLO Sales Stores”
- ID027 “10MW Mini Hydro Power Plant Project in North Sumatra”
- ID029 “Energy Saving by Introducing High Efficiency Autoclave to Infusion Manufacturing Factory”
- ID032 “Introduction of CNG-Diesel Hybrid Equipment to Public Bus in Semarang”
- ID033 “4.2MW Rooftop Solar Power Project to Pharmaceutical Factories, Vehicles Dealers, and Timber Factories”
- ID034 “Energy Saving by Introducing High Efficiency Autoclave to Infusion Manufacturing Factory 2”
- ID035 “Rehabilitation Project of Power Generation System at Karai 7 Mini Hydro Power Plant”
Approval of a proposed methodology
ID_AM029 (ver01.0) “Installation of closed drain recovery system and utilization for boiler feed water”
Approval of the revised methodologies
ID_AM002 (ver03.0) “Energy Saving by Introduction of High Efficiency Centrifugal Chiller”
ID_AM004 (ver03.0) “Installation of Inverter-Type Air Conditioning System for Cooling for Grocery Store”
ID_AM005 (ver03.0) “Installation of LED Lighting for Grocery Store”
ID_AM008 (ver03.0) “Installation of a separate type fridge-freezer showcase by using natural refrigerant for grocery store to reduce air conditioning load inside the store”
ID_AM010 (ver02.0) “Introducing double-bundle modular electric heat pumps to a new building”
ID_AM023 (ver01.1) “Installation of gas engine cogeneration system with absorption chiller to supply electricity, heating energy and cooling energy”
Designation of third-party entities
- LGAI Technological Center S.A. (Applus+ Certification)
- Korean Standards Association
- Enviance Services Private Limited
- Ampere For Renewable Energy
- PT Superintending Company of Indonesia (PT SUCOFINDO) – SBU Sertifikasi dan Eco Framework (Sucofindo International Certification Services)
- Earthood Services Limited