The Joint Committee adopted the decision on a proposed methodology, a proposed revision to the approved methodology and a proposed JCM project by electronic means.
Approval of a proposed methodology
ID_AM019 (ver01.0) “Electricity generation by installation of run-of-river hydro power generation system(s) in Indonesia”
Approval of a revised methodology
ID_AM006 (ver02.1) “GHG emission reductions through optimization of refinery plant operation in Indonesia”
Registration of proposed JCM project
- ID019 “Installation of gas engine cogeneration system to supply electricity and heat to the vehicle manufacturing factory of PT. Toyota Motor Manufacturing Indonesia”