News

Subject Country Published date
Call for public comments on a proposed JCM project (Thailand) “Introduction of Solar PV Systems on Rooftops of Factory and Office Building” (6 July to 4 August 2017) Thailand 06 Jul 17
Call for public inputs on a JCM proposed methodology (Viet Nam) “Installation of Container Formation Facility at Acid Lead Battery Factory” (13 June to 27 June 2017) Viet Nam 13 Jun 17
Call for public inputs on a proposed JCM project (Mongolia) “A HIGH EFFICIENCY AND LOW LOSS POWER TRANSMISSION AND DISTRIBUTION SYSTEM IN MONGOLIA” (7 June to 6 July 2017) Mongolia 07 Jun 17
Call for public inputs on a JCM proposed methodology “Installation of LED lighting equipment to fishing boats” (2 June to 16 June 2017) Viet Nam 02 Jun 17
Electronic Decision by the JC Mongolia 26 May 17
Call for public comments on a proposed revision to the approved methodology ID_AM006 “GHG emission reductions through optimization of refinery plant operation in Indonesia" (13 May 2017 to 27 May 2017) Indonesia 13 May 17
Decision by the JC Indonesia 10 May 17
Call for public inputs on a proposed JCM project (Bangladesh) “Installation of High Efficiency Centrifugal Chiller for Air Conditioning System in Clothing Tag Factory in Bangladesh” (1 April 2017 to 30 April 2017) Bangladesh 01 Apr 17
3rd Joint Committee in Nairobi Kenya 23 Mar 17
3rd Joint Committee in Addis Ababa Ethiopia 21 Mar 17
Call for public inputs on JCM proposed methodologies “Installation of Solar PV System” and "Installation of Run-of-river Small Hydropower Generation Plant" (2 March 2017 to 16 March 2017) Kenya 02 Mar 17
Call for public inputs on a proposed JCM project “Electrification of communities using Ultra Low Head Micro Hydro Power Generation system” (1 March 2017 to 30 March 2017) Kenya 01 Mar 17
Call for public inputs on a JCM proposed methodology “Introduction of Biomass Combined Heat and Power Plant” (24 February 2017 to 10 March 2017) Ethiopia 24 Feb 17
Electronic Decision by the JC Viet Nam 24 Feb 17
Call for public inputs on a proposed JCM project (Viet Nam) “Introduction of High Efficiency Air-conditioning in Hotel” (18 February 2017 to 19 March 2017) Viet Nam 18 Feb 17
Call for public inputs on proposed JCM projects (Mongolia) “Installation of 2.1MW Solar Power Plant for Power Supply In Ulaanbaatar Suburb” and "10MW Solar Power Project in Darkhan City” (9 February 2017 to 10 March 2017) Mongolia 09 Feb 17
6th Joint Committee in Tokyo Indonesia 09 Feb 17
Electronic Decision by the JC Chile 06 Feb 17
Electronic Decision by the JC Cambodia 04 Feb 17
Call for public comments on a proposed JCM project (Indonesia) “Energy Saving for Air-Conditioning at Shopping Mall with High Efficiency Centrifugal Chiller” (2 February 2017 to 3 March 2017) Indonesia 02 Feb 17