Call for public inputs on JCM proposed methodologies (Costa Rica) “Energy Saving by Introduction of High Efficiency Centrifugal Chiller” and “Installation of Electric Heat Pump Type Water Heater for Hot Water Supply Systems” (20 September to 4 October 2017) |
Costa Rica |
20 Sep 17 |
Call for public inputs on a JCM proposed methodology (Saudi Arabia) “Introduction of High Efficiency Electrolyzer in Chlor-Alkali Processing Plant” (18 September to 2 October 2017) |
Saudi Arabia |
18 Sep 17 |
Call for public inputs on a JCM proposed methodology (Mexico) “Installation of Solar PV System” (15 to 29 September 2017) |
Mexico |
15 Sep 17 |
3rd Joint Committee in Phnom Penh |
Cambodia |
15 Sep 17 |
Call for public inputs on a proposed JCM project (Cambodia) “Introduction of Ultra-lightweight Solar Panels for Power Generation at International School” (14 September to 13 October 2017) |
Cambodia |
14 Sep 17 |
2nd Joint Committee in Mexico City |
Mexico |
11 Sep 17 |
Electronic Decision by the JC |
Kenya |
10 Sep 17 |
2nd Joint Committee in San Jose |
Costa Rica |
08 Sep 17 |
Electronic Decision by the JC |
Mongolia |
28 Aug 17 |
3rd Joint Committee in Bangkok |
Thailand |
21 Aug 17 |
Call for public inputs on a JCM proposed methodology (Costa Rica) “Installation of Solar PV System” (19 August to 2 September 2017) |
Costa Rica |
19 Aug 17 |
Call for public comments on JCM proposed methodologies and proposed revisions to the approved methodology TH_AM002 (Thailand) (5 August to 19 August 2017) |
Thailand |
05 Aug 17 |
3rd Joint Committee in Vientiane |
Laos |
31 Jul 17 |
Call for public comments on a proposed JCM project (Indonesia) “Reduction of Energy Consumption by Introducing an Energy-Efficient Waste Paper Processing System into a Packaging Paper Factory in Bekasi, West Java” (22 July to 20 August 2017) |
Indonesia |
22 Jul 17 |
Decision by the JC |
Indonesia |
19 Jul 17 |
Call for public comments on a proposed JCM project (Thailand) “Introduction of Solar PV Systems on Rooftops of Factory and Office Building” (6 July to 4 August 2017) |
Thailand |
06 Jul 17 |
Call for public inputs on a JCM proposed methodology (Viet Nam) “Installation of Container Formation Facility at Acid Lead Battery Factory” (13 June to 27 June 2017) |
Viet Nam |
13 Jun 17 |
Call for public inputs on a proposed JCM project (Mongolia) “A HIGH EFFICIENCY AND LOW LOSS POWER TRANSMISSION AND DISTRIBUTION SYSTEM IN MONGOLIA” (7 June to 6 July 2017) |
Mongolia |
07 Jun 17 |
Call for public inputs on a JCM proposed methodology “Installation of LED lighting equipment to fishing boats” (2 June to 16 June 2017) |
Viet Nam |
02 Jun 17 |
Electronic Decision by the JC |
Mongolia |
26 May 17 |