Call for public inputs on a proposed JCM project (Laos) “Lao PDR Energy Efficient Datacenter Project (LEED)” (27 December 2016 to 25 January 2017) |
Laos |
27 Dec 16 |
Call for public inputs on proposed revisions to the approved methodology MN_AM003 “Installation of Solar PV System” (27 December 2016 to 10 January 2017) |
Mongolia |
27 Dec 16 |
Electronic Decision by the JC |
Palau |
19 Dec 16 |
Call for public inputs on a JCM proposed methodology “Installation of Solar PV System” (17 December 2016 to 31 December 2016) |
Cambodia |
17 Dec 16 |
5th Joint Committee in Hanoi |
Viet Nam |
20 Oct 16 |
2nd Joint Committee in Vientiane |
Laos |
14 Oct 16 |
Call for public inputs on a JCM proposed methodology “Installation of Solar PV System” (4 October to 18 October 2016) |
Viet Nam |
04 Oct 16 |
4th Joint Committee in Ulaanbaatar |
Mongolia |
29 Sep 16 |
Call for public inputs on a JCM proposed methodology (Mongolia) “Installation of Solar PV System” (13 September to 27 September 2016) |
Mongolia |
13 Sep 16 |
Electronic Decision by the JC |
Chile |
05 Sep 16 |
2nd Joint Committee in Bangkok |
Thailand |
23 Aug 16 |
Electronic Decision by the JC |
Mongolia |
20 Aug 16 |
Call for public inputs on a JCM proposed methodology “Introduction of air conditioning system equipped with inverters” (17 August to 31 August 2016) |
Viet Nam |
17 Aug 16 |
Call for public comments on a JCM proposed methodology “Energy Saving by Introduction of High Efficiency Centrifugal Chiller” (9 August to 23 August 2016) |
Thailand |
09 Aug 16 |
Call for public comments on a JCM proposed methodology “Energy Saving by Introduction of Multi-stage Oil-Free Air Compressor” (6 August to 20 August 2016) |
Thailand |
06 Aug 16 |
Call for public comments on a proposed JCM project (Indonesia) “Introducing double-bundle modular electric heat pumps at AXIA SOUTH CIKARANG Tower 2” (6 August to 4 September 2016) |
Indonesia |
06 Aug 16 |
Call for public inputs on a JCM proposed methodology “Installation and operation of energy-efficient data center (DC) in the Lao PDR” (4 August to 18 August 2016) |
Laos |
04 Aug 16 |
Electronic Decision by the JC |
Mongolia |
30 Jul 16 |
Call for public comments on a JCM proposed methodology “Installation of Solar PV System” (29 July to 12 August 2016) |
Thailand |
29 Jul 16 |
Call for public inputs on proposed revisions to the approved methodology VN_AM001 “Transportation energy efficiency activities by installing digital tachograph systems” (29 July to 12 August 2016) |
Viet Nam |
29 Jul 16 |