Proposed methodologies

Methodology No. Title Status Public input date
KH_PM002 Installation of Solar PV System Approved 17 Dec 16   -   31 Dec 16
KH_PM001 Installation of LED street lighting system with wireless network control Approved 05 Apr 16   -   19 Apr 16