Proposed methodologies

Methodology No. Title Status Public input date
KH_PM004 Reducing deforestation and forest degradation through forest conservation in Cambodia Open for public inputs 22 May 19   -   05 Jun 19
KH_PM003 Introduction of High Efficiency Centrifugal Chiller Public inputs closed 14 Dec 18   -   28 Dec 18
KH_PM002 Installation of Solar PV System Approved 17 Dec 16   -   31 Dec 16
KH_PM001 Installation of LED street lighting system with wireless network control Approved 05 Apr 16   -   19 Apr 16