Electronic Decision by the JC |
27 Feb 21 |
Approval of revised methodology:
|
|
KH_AM004 (ver01.1) "Reducing deforestation and forest degradation through forest conservation in Cambodia"
|
|
Designation of third-party entities:
|
|
- Scientific Certification Systems, Inc., DBA SCS Global Services
|
|
- Aster Global Environmental Solutions, Inc. (Aster Global)
|
|
Electronic Decision by the JC |
29 Jun 20 |
Joint Crediting Mechanism Rules of Procedures for the Joint Committee (version 02.0)
|
|
5th Joint Committee in Phnom Penh |
21 Feb 20 |
Meeting Report
|
|
Annex 1: JCM Validation Report Form for REDD-plus (version 01.0)
|
|
Annex 2: JCM Verification Report Form for REDD-plus (version 01.0)
|
|
Annex 3: Rules of Implementation for the Joint Crediting Mechanism (JCM) (version 04.1)
|
|
Annex 4: KH_AM003 “Introduction of High Efficiency Centrifugal Chiller”
|
|
Annex 5: KH_AM004 “Reducing deforestation and forest degradation through forest conservation in Cambodia”
|
|
Annex 6: KH_AM005 “Installation of inverters to distribution pumps in water treatment plant”
|
|
Registration of a proposed JCM project:
|
|
- KH002 "Introduction of High Efficiency LED Lighting Utilizing Wireless Network"
|
|
Decision on issuance of credits:
|
|
- KH001 “Introduction of Ultra-lightweight Solar Panels for Power Generation at International School” for the monitoring period of 01 Aug 16 - 31 Jul 18
|
|
Designation of a TPE for an additional sectoral scope:
|
|
- EPIC Sustainability Services Private Limited (EPIC)
|
|
Decision on change in designation status of a TPE:
|
|
- Lloyd’s Register Quality Assurance Limited (LRQA)
|
|
4th Joint Committee in Phnom Penh |
30 May 18 |
Meeting Report
|
|
Annex 1: Rules of Implementation for the JCM (version 04.0)
|
|
Annex 2: JCM Project Cycle Procedure for REDD-plus (version 01.0)
|
|
Annex 3: JCM Guidelines for Developing Proposed Methodology for REDD-plus (version 01.0)
|
|
Annex 4: JCM Guidelines for Developing Project Design Document and Monitoring Report for REDD-plus (version 01.0)
|
|
Annex 5: JCM Guidelines for Addressing and Respecting Safeguards for REDD-plus (version 01.0)
|
|
Annex 6: JCM Guidelines for Validation and Verification for REDD-plus (version 01.0)
|
|
Annex 7: JCM Glossary of Terms (version 02.0)
|
|
Annex 8: JCM Modalities of Communication Statement Form for REDD-plus (version 01.0)
|
|
Annex 9: JCM Guidelines for Developing Proposed Methodology (version 03.0)
|
|
Annex 10: JCM Guidelines for Designation as a Third-Party Entity (version 03.0)
|
|
Electronic Decision by the JC |
12 Mar 18 |
Registration of a proposed JCM project:
|
|
- KH001 “Introduction of Ultra-lightweight Solar Panels for Power Generation at International School”
|
|
3rd Joint Committee in Phnom Penh |
15 Sep 17 |
Meeting Report
|
|
Annex 1: Rules of Implementation for the Joint Crediting Mechanism (JCM) (version 03.0)
|
|
Annex 2: JCM Guidelines for Developing Project Design Document and Monitoring Report (version 03.0)
|
|
Annex 3: JCM Verification Report Form (version 02.0)
|
|
Annex 4: JCM Credits Issuance Request Form (version 03.0)
|
|
Annex 5: JCM Project Cycle Procedure (version 03.0)
|
|
Designation of a TPE for additional sectoral scopes of 1, 2 and 3 for verification
|
|
- Japan Management Association
|
|
Electronic Decision by the JC |
04 Feb 17 |
Approval of a proposed methodology with revisions:
|
|
KH_AM002 "Installation of Solar PV System"
|
|
2nd Joint Committee in Phnom Penh |
26 Apr 16 |
Meeting Report
|
|
Annex 1: Rules of Implementation for the Joint Crediting Mechanism (JCM) (version 02.0)
|
|
Annex 2: JCM Project Cycle Procedures (version 02.0)
|
|
Annex 2.1. JCM Credits Issuance Request Form (version 02.0)
|
|
Annex 3: JCM Guidelines for Developing Proposed Methodology (version 02.0)
|
|
Annex 4: JCM Guidelines for Developing Project Design Document and Monitoring Report (version 02.0)
|
|
Annex 5: JCM Guidelines for Designation as a Third-Party Entity (version 02.0)
|
|
Annex 6: Common Specifications of the JCM Registry
|
|
Annex 7: KH_AM001 “Installation of LED street lighting system with wireless network control”
|
|
Electronic Decision by the JC |
21 Apr 16 |
Designation of third-party entities:
|
|
- EPIC Sustainability Services Private Limited (EPIC)
|
|
- Japan Management Association
|
|
- Deloitte Tohmatsu Evaluation and Certification Organization (Deloitte-TECO)
|
|
- Bureau Veritas Certification Holding SAS
|
|
Electronic Decision by the JC |
03 May 15 |
Designation of third-party entities:
|
|
- KBS Certification Services Pvt. Ltd. (KBS)
|
|
- Lloyd's Register Quality Assurance Limited (LRQA)
|
|
- Japan Quality Assurance Organization (JQA)
|
|
1st Joint Committee in Phnom Penh |
16 Jan 15 |
Meeting Report
|
|
Annex 1: Joint Crediting Mechanism Rules of Procedures for the Joint Committee
|
|
Annex 2: Rules of Implementation for the Joint Crediting Mechanism (JCM)
|
|
Annex 3: Joint Crediting Mechanism Project Cycle Procedure
|
|
Annex 3.1. JCM Modalities of Communication Statement Form
|
|
Annex 3.2. JCM Validation Report Form
|
|
Annex 3.3. JCM Project Registration Request Form
|
|
Annex 3.4. JCM Verification Report Form
|
|
Annex 3.5. JCM Credits Issuance Request Form
|
|
Annex 3.6. JCM Approved Methodology Revision Request Form
|
|
Annex 3.7. JCM Post-Registration Changes Request Form
|
|
Annex 3.8. JCM Project Withdrawal Request Form
|
|
Annex 3.9. JCM Registration Request Withdrawal Form
|
|
Annex 3.10. JCM Issuance Request Withdrawal Form
|
|
Annex 4: Joint Crediting Mechanism Guidelines for Developing Proposed Methodology
|
|
Annex 5: Joint Crediting Mechanism Guidelines for Developing Project Design Document and Monitoring Report
|
|
Annex 6: Joint Crediting Mechanism Guidelines for Designation of a Third-Party Entity
|
|
Annex 7: Joint Crediting Mechanism Guidelines for Validation and Verification
|
|
Annex 8: Joint Crediting Mechanism Glossary of Terms
|
|