Approved methodologies

Methodology No. Title Latest version Status Date of approval
KH_AM001 Installation of LED street lighting system with wireless network control Ver1.0 Valid 26 Apr 16
KH_AM002 Installation of Solar PV System Ver1.0 Valid 04 Feb 17
KH_AM003 Introduction of High Efficiency Centrifugal Chiller Ver1.0 Valid 21 Feb 20
KH_AM004 Reducing deforestation and forest degradation through forest conservation in Cambodia Ver1.1 Valid 27 Feb 21
KH_AM005 Installation of inverters to distribution pumps in water treatment plant Ver1.0 Valid 21 Feb 20