| Call for public inputs on a JCM proposed methodology “Energy Saving by Introduction of High Firewood Efficiency Cookstove to Replace Traditional Cookstove” (Cambodia) (7 to 21 February 2025) | 
        07 Feb 25 | 
      
      
        | Outcome of the consideration on JCM proposed methodologies "Energy Saving by Introduction of High Efficiency Firewood Cookstove to Replace Traditional Cookstove" and "Energy Saving by Introduction of Low Greenhouse gas-emitting safe drinking water production systems" (Cambodia)  | 
        15 Oct 24 | 
      
      
        | Call for public inputs on JCM proposed methodologies “"Energy Saving by Introduction of High Efficiency Firewood Cookstove to Replace Traditional Cookstove" and "Energy Saving by Introduction of Low Greenhouse gas-emitting safe drinking water production systems" (Cambodia) (20 July to 3 August 2024) | 
        20 Jul 24 | 
      
      
        | 6th Joint Committee in Phnom Penh and Online | 
        22 Dec 23 | 
      
      
        | Electronic Decision by the JC | 
        09 Jun 23 | 
      
      
        | Call for public inputs on a JCM REDD-plus safeguard activity progress report on "Prey Lang Wildlife Sanctuary - Stung Treng REDD+ project" (Cambodia) (10 to 24 May 2023) | 
        10 May 23 | 
      
      
        | Correction to the Approved Methodologies page of the JCM website | 
        16 Jan 23 | 
      
      
        | Call for public inputs on a proposed JCM project (Cambodia) “Prey Lang Wildlife Sanctuary - Stung Treng REDD+ project” (7 October to 5 November 2021) | 
        07 Oct 21 | 
      
      
        | Electronic Decision by the JC | 
        27 Feb 21 | 
      
      
        | Call for public inputs on a proposed JCM project (Cambodia) “Energy Saving by Inverters for Distribution Pumps in Water Treatment Plant” (24 December 2020 to 22 January 2021) | 
        24 Dec 20 | 
      
      
        | Call for public inputs on a proposed JCM project (Cambodia) “Introduction of 1MW Solar Power System and High Efficiency Centrifugal Chiller in Large Shopping Mall” (1 to 30 December 2020) | 
        01 Dec 20 | 
      
      
        | Electronic Decision by the JC | 
        27 Jun 20 | 
      
      
        | 5th Joint Committee in Phnom Penh | 
        21 Feb 20 | 
      
      
        | Call for public inputs on JCM proposed methodology “Installation of inverters to distribution pumps in water treatment plant” (Cambodia) (8 to 22 October 2019) | 
        08 Oct 19 | 
      
      
        | Call for public inputs on a proposed JCM project “Introduction of High Efficiency LED Lighting Utilizing Wireless Network” (Cambodia) (8 October to 6 November 2019) | 
        08 Oct 19 | 
      
      
        | Call for public inputs on JCM proposed methodology “Reducing deforestation and forest degradation through forest conservation in Cambodia” (Cambodia) (22 May to 5 June 2019) | 
        22 May 19 | 
      
      
        | Call for public inputs on JCM proposed methodology “Introduction of High Efficiency Centrifugal Chiller” (Cambodia) (14 December to 28 December 2018) | 
        14 Dec 18 | 
      
      
        | 4th Joint Committee in Phnom Penh | 
        30 May 18 | 
      
      
        | Electronic Decision by the JC | 
        12 Mar 18 | 
      
      
        | 3rd Joint Committee in Phnom Penh | 
        15 Sep 17 |