Call for public inputs on JCM proposed methodologies "Introduction of tunnel and/or shuttle kiln with waste heat recovery system", "Energy Saving by Introduction of High Efficiency Inverter Type Centrifugal Chiller", "Energy Saving by Introduction of Heat Recovery Electric Heat Pump", "Energy saving by introduction of high-efficiency double suction volute pumps in water supply system" and "Introduction of energy efficient wire stranding machines to automotive wire production factory" (Viet Nam) (14 to 28 August 2018) |
14 Aug 18 |
Call for public inputs on a proposed JCM project (Viet Nam) “Introduction of Energy-Efficient Air Conditioners in RICOH IMAGING PRODUCTS (Vietnam) CO., LTD” (16 December 2017 to 14 January 2018) |
16 Dec 17 |
Call for public inputs on proposed JCM projects (Viet Nam) “Introduction of Solar PV System at shopping mall in Ho Chi Minh” and “Introduction of Amorphous High Efficiency Transformers in Southern and Central Power Grids” (8 December 2017 to 6 January 2018) |
08 Dec 17 |
Call for public inputs on a proposed JCM project (Viet Nam) “Energy saving and work efficiency improvement by introducing a new chip-on-board LED system in Vietnam” (18 November to 17 December 2017) |
18 Nov 17 |
6th Joint Committee in Hanoi |
10 Oct 17 |
Call for public inputs on a JCM proposed methodology (Viet Nam) “Installation of Container Formation Facility at Acid Lead Battery Factory” (13 June to 27 June 2017) |
13 Jun 17 |
Call for public inputs on a JCM proposed methodology “Installation of LED lighting equipment to fishing boats” (2 June to 16 June 2017) |
02 Jun 17 |
Electronic Decision by the JC |
24 Feb 17 |
Call for public inputs on a proposed JCM project (Viet Nam) “Introduction of High Efficiency Air-conditioning in Hotel” (18 February 2017 to 19 March 2017) |
18 Feb 17 |
5th Joint Committee in Hanoi |
20 Oct 16 |
Call for public inputs on a JCM proposed methodology “Installation of Solar PV System” (4 October to 18 October 2016) |
04 Oct 16 |
Call for public inputs on a JCM proposed methodology “Introduction of air conditioning system equipped with inverters” (17 August to 31 August 2016) |
17 Aug 16 |
Call for public inputs on proposed revisions to the approved methodology VN_AM001 “Transportation energy efficiency activities by installing digital tachograph systems” (29 July to 12 August 2016) |
29 Jul 16 |
Electronic Decision by the JC |
15 May 16 |
Call for public inputs on a proposed JCM project (Viet Nam) “Introduction of amorphous high efficiency transformers in power distribution systems in the southern part of Viet Nam” (19 February to 19 March 2016) |
19 Feb 16 |
Call for public inputs on a proposed JCM project (Viet Nam) “Low carbon hotel project in Vietnam: Improving the energy efficiency of commercial buildings by utilization of high efficiency equipment” (5 December 2015 to 3 January 2016) |
05 Dec 15 |
Electronic Decision by the JC |
30 Nov 15 |
Decision by the JC |
03 Sep 15 |
4th Joint Committee in Hanoi |
04 Aug 15 |
Call for public inputs on a proposed JCM project (Viet Nam) “Promotion of green hospitals by improving efficiency / environment in national hospitals in Vietnam” (24 July to 22 August 2015) |
24 Jul 15 |