The 6th Joint Committee of the Joint Crediting Mechanism between Viet Nam and Japan was held in Hanoi.
Meeting report
Annex 1: Joint Crediting Mechanism Project Cycle Procedure (version 04.0)
Annex 2: VN_AM007 “Installation of Solar PV System”
Annex 3: VN_AM008 “Installation of LED lighting equipment to fishing boats”
Annex 4: VN_AM009 “Installation of Container Formation Facility at Lead Acid Battery Factory”
Registration of a proposed JCM project
- VN005 “Introduction of High Efficiency Air-conditioning in Hotel”
Decision on issuance of credits
- VN004 “Introduction of amorphous high efficiency transformers in power distribution systems in the southern part of Viet Nam” for the monitoring period of 01 Jan 16 – 31 Mar 16
- VN001 “Eco-Driving by Utilizing Digital Tachograph System” for the monitoring period of 01 Aug 15 – 30 Jun 16
Designation of a TPE for additional sectoral scopes of 1, 2 and 3 for verification
- Japan Management Association