Project : BD001 Energy Saving for Air Conditioning & Facility Cooling by High Efficiency Chiller (Dhaka Suburbs)

Project title Energy Saving for Air Conditioning & Facility Cooling by High Efficiency Chiller (Dhaka Suburbs)
Ref No. BD001
PDD form
Monitoring plan
Name of project participants (Bangladesh) City Sugar Industries Limited (Focal Point (2) )
Name of project participants (Japan) Nippon Koei Co., Ltd. (Focal Point (1) ); Ebara Refrigeration Equipment & Systems Co., Ltd.
Name of third party entity (TPE) TPE-BD-001 LRQA Limited (formerly Lloyd’s Register Quality Assurance Limited)
Location of project Country: Bangladesh
Region/State/Province etc: Dhaka Division
City/Town/Community etc: Narayangonj District
Latitude, longitude:

N 23°45'03", E 90°30'59"

Duration Starting date of project operation: 01 Feb 16
Expected operational lifetime of project: 10 years
Methodology No.
Emission Reductions (tCO2e) Estimated emission reductions in each year
  • - (in 2013)
  • - (in 2014)
  • - (in 2015)
  • 45 (in 2016)
  • 58 (in 2017)
  • 66 (in 2018)
  • 107 (in 2019)
  • 107 (in 2020)
  • 107 (in 2021)
  • 107 (in 2022)
  • 107 (in 2023)
  • 107 (in 2024)
  • 107 (in 2025)
  • - (in 2026)
  • - (in 2027)
  • - (in 2028)
  • - (in 2029)
  • - (in 2030)
Status Validation
Public inputs
  • 07 Mar 19  -  05 Apr 19