Project : ID039 Introduction of 3.1MW Rooftop Solar Power System to Fast-Moving Consumer Goods and Printing Factories in Java Island

Project title Introduction of 3.1MW Rooftop Solar Power System to Fast-Moving Consumer Goods and Printing Factories in Java Island
Ref No. ID039
PDD form
Monitoring plan
Name of project participants (Indonesia) PT Alam Energy Renewables; PT Kao Indonesia; PT DNP Indonesia
Name of project participants (Japan) Alamport Inc.; Shizen Energy Inc.
Name of third party entity (TPE) TPE-ID-011 PT. MUTUAGUNG LESTARI
Location of project Country: Republic of Indonesia
Region/State/Province etc: West Java Province
City/Town/Community etc: Location 1: Jl. Harapan VI Lot LL 3A, Kawasan Karawang International Industrial City, Karawang; Location 2: Jalan Maligi Raya Lot F1 and F4, Kawasan Karawang International Industrial City, Karawang
Latitude, longitude:

Location 1: S 6°22'38" and E 107°17'37.75"; Location 2: S 6°21'36.36" and E 107°16'25.32"

Duration Starting date of project operation: 01 Feb 24
Expected operational lifetime of project: 10 years
Methodology No.
Emission Reductions (tCO2e) Estimated emission reductions in each year
  • - (in 2013)
  • - (in 2014)
  • - (in 2015)
  • - (in 2016)
  • - (in 2017)
  • - (in 2018)
  • - (in 2019)
  • - (in 2020)
  • - (in 2021)
  • - (in 2022)
  • - (in 2023)
  • 2,132 (in 2024)
  • 2,671 (in 2025)
  • 2,671 (in 2026)
  • 2,671 (in 2027)
  • 2,671 (in 2028)
  • 2,671 (in 2029)
  • 2,671 (in 2030)
Status Validation
Public comments
  • 07 Feb 25  -  08 Mar 25