Project title |
Introduction of 3.1MW Rooftop Solar Power System to Fast-Moving Consumer Goods and Printing Factories in Java Island Ref No. ID039 PDD form Monitoring plan |
---|---|
Name of project participants (Indonesia) | PT Alam Energy Renewables; PT Kao Indonesia; PT DNP Indonesia |
Name of project participants (Japan) | Alamport Inc.; Shizen Energy Inc. |
Name of third party entity (TPE) | TPE-ID-011 PT. MUTUAGUNG LESTARI |
Location of project |
Country: Republic of Indonesia Region/State/Province etc: West Java Province City/Town/Community etc: Location 1: Jl. Harapan VI Lot LL 3A, Kawasan Karawang International Industrial City, Karawang; Location 2: Jalan Maligi Raya Lot F1 and F4, Kawasan Karawang International Industrial City, Karawang Latitude, longitude: Location 1: S 6°22'38" and E 107°17'37.75"; Location 2: S 6°21'36.36" and E 107°16'25.32" |
Duration |
Starting date of project operation: 01 Feb 24 Expected operational lifetime of project: 10 years |
Methodology No. | |
Emission Reductions (tCO2e) |
Estimated emission reductions in each year
|
Status | Validation |
Public comments |
|