Electronic Decision by the JC |
04 Jan 21 |
Electronic Decision by the JC |
17 May 19 |
Electronic Decision by the JC |
15 Mar 19 |
6th Joint Committee in Ulaanbaatar |
06 Nov 18 |
Electronic Decision by the JC |
16 Nov 17 |
5th Joint Committee in Ulaanbaatar |
24 Oct 17 |
Decision by the JC |
24 Oct 17 |
Electronic Decision by the JC |
28 Aug 17 |
Call for public inputs on a proposed JCM project (Mongolia) “A HIGH EFFICIENCY AND LOW LOSS POWER TRANSMISSION AND DISTRIBUTION SYSTEM IN MONGOLIA” (7 June to 6 July 2017) |
07 Jun 17 |
Electronic Decision by the JC |
26 May 17 |
Call for public inputs on proposed JCM projects (Mongolia) “Installation of 2.1MW Solar Power Plant for Power Supply In Ulaanbaatar Suburb” and "10MW Solar Power Project in Darkhan City” (9 February 2017 to 10 March 2017) |
09 Feb 17 |
Electronic Decision by the JC |
30 Jan 17 |
Call for public inputs on proposed revisions to the approved methodology MN_AM003 “Installation of Solar PV System” (27 December 2016 to 10 January 2017) |
27 Dec 16 |
4th Joint Committee in Ulaanbaatar |
29 Sep 16 |
Call for public inputs on a JCM proposed methodology (Mongolia) “Installation of Solar PV System” (13 September to 27 September 2016) |
13 Sep 16 |
Electronic Decision by the JC |
20 Aug 16 |
Electronic Decision by the JC |
30 Jul 16 |
Electronic Decision by the JC |
26 Sep 15 |
3rd Joint Committee in Ulaanbaatar |
30 Jun 15 |
Call for public inputs on proposed JCM projects (Mongolia) “Installation of high-efficiency Heat Only Boilers in 118th School of Ulaanbaatar City Project” and “Centralization of heat supply system by installation of high-efficiency Heat Only Boilers in Bornuur soum Project” (28 May to 26 June 2015) |
28 May 15 |