JC Decision

Decision Date
Decision by the Joint Committee (Electronic Decision) 20 Apr 20
Approval of a proposed methodology with revisions:
MM_AM005 “Power Generation by Waste Heat Recovery in Cement Industry”
Decision by the Joint Committee (Electronic Decision) 16 Jan 20
Registration of a proposed JCM project:
- MM001 “Yangon Waste to Energy plant by introducing power generation and avoidance of landfill gas emissions through combustion of municipal solid waste (MSW)”
Approval of a proposed methodology:
MM_AM004 "Installation of rice husk power plant in Ayeyarwady region"
Approval of proposed methodologies with revisions:
MM_AM002 "Installation of Energy-efficient Refrigerators Using Natural Refrigerant at Cold Storage"
MM_AM003 "Energy Saving by Introduction of High Efficiency Once-through Boiler"
Designation of a TPE for an additional sectoral scope of 12 for validation and verification:
- EPIC Sustainability Services Private Limited (EPIC)
Decision by the Joint Committee (Electronic Decision) 15 Mar 19
Designation of a third-party entity
- EPIC Sustainability Services Private Limited (EPIC)
Decision by the Joint Committee (Electronic Decision) 25 Jun 18
Approval of a proposed methodology:
MM_AM001 "Power generation and avoidance of landfill gas emissions through combustion of municipal solid waste (MSW)"
2nd Joint Committee in Nay Pyi Taw 21 Mar 18
Meeting Report
Annex 1: Guidance for Implementation of the Joint Crediting Mechanism (JCM) (version 02.0)
Annex 2: JCM Guidelines for Developing Project Design Document and Monitoring Report (version 02.0)
Annex 3: JCM Verification Report Form (version 02.0)
Annex 4: JCM Credits Issuance Request Form (version 02.0)
Annex 5: JCM Project Cycle Procedure (version 02.0)
Annex 6: Common Specifications of the JCM Registry (version 01.0)
Designation of third-party entities:
- Japan Quality Assurance Organization (JQA)
- Lloyd’s Register Quality Assurance Limited (LRQA)
Decision by the Joint Committee 18 Jan 18
Joint Crediting Mechanism Guidance for Procedures for the Joint Committee
Guidance for the Implementation of the Joint Crediting Mechanism (JCM)
Joint Crediting Mechanism Project Cycle Procedure
JCM Modalities of Communication Statement Form
JCM Validation Report Form
JCM Project Registration Request Form
JCM Verification Report Form
JCM Credits Issuance Request Form
JCM Approved Methodology Revision Request Form
JCM Post-Registration Changes Request Form
JCM Project Withdrawal Request Form
JCM Registration Request Withdrawal Form
JCM Issuance Request Withdrawal Form
Joint Crediting Mechanism Guidelines for Developing Proposed Methodology
Joint Crediting Mechanism Guidelines for Developing Project Design Document and Monitoring Report
Joint Crediting Mechanism Guidelines for Designation as a Third-Party Entity
Joint Crediting Mechanism Guidelines for Validation and Verification
Joint Crediting Mechanism Glossary of Terms
1st Joint Committee in Nay Pyi Taw 04 Apr 16
Meeting Report