MM_PM007 |
Introduction of heat recovery system and high efficiency once-through boiler at the beer factory |
Public inputs closed |
02 Oct 20 - 16 Oct 20
|
MM_PM006 |
Introduction of cascade cooling system and/or temperature stratification tank at the beer factory |
Public inputs closed |
02 Oct 20 - 16 Oct 20
|
MM_PM005 |
Power Generation by Waste Heat Recovery in Cement Industry |
Approved |
29 Jan 20 - 12 Feb 20
|
MM_PM004 |
Installation of rice husk power plant in Ayeyarwady region |
Approved |
13 Sep 19 - 27 Sep 19
|
MM_PM003 |
Energy Saving by Introduction of High Efficiency Once-through Boiler |
Approved |
13 Sep 19 - 27 Sep 19
|
MM_PM002 |
Installation of Energy-efficient Refrigerators Using Natural Refrigerant at Cold Storage |
Approved |
13 Sep 19 - 27 Sep 19
|
MM_PM001 |
Power generation and avoidance of landfill gas emissions through combustion of municipal solid waste (MSW) |
Approved |
23 Mar 18 - 06 Apr 18
|