Methodology No. | MM_AM004 |
---|---|
Proposed Methodology No. | MM_PM004 |
Sectoral scope | 1. Energy industries (renewable – / non-renewable sources) |
Title | Installation of rice husk power plant in Ayeyarwady region |
Summaries |
GHG emission reduction measures : GHG emission reductions can be achieved through the displacement of grid and/or captive electricity by installation and operation of a rice husk power plant. Calculation of reference emissions : Reference emissions are calculated from net electricity generation by the project which replaces grid electricity and/or captive use where the project is implemented during a given time period. Calculation of project emissions : Project emissions are determined to be zero in this methodology. Monitoring parameters : Amount of electricity generated by a rice husk power plant. |
Version Number | Ver1.0 |
Status | Valid |
Methodology Proponent | Fujita Corporation |
Approved Methodology | |
Proposed Methodology | |
Public inputs |
|
Date of approval | 16 Jan 20 |