Methodology No. BD_PM005
Sectoral scope 2. Energy distribution
Title Installation of energy-saving conductors for transmission lines in the Bangladesh grid
Summaries GHG emission reduction measures : Reduction of transmission loss by introduction of HTLS.
Calculation of reference emissions : Calculation of GHG emissions due to transmission loss in ACSR, based on the parameters derived from ASTM International Standard B232 (Standard Specification for ACSR).
Calculation of project emissions : GHG emissions due to transmission loss in HTLS, based on monitored transmission loss.
Monitoring parameters : Power sent from the point of origin/supply to the transmission line, power received at the point of end/receipt of the transmission line.
Status Public inputs closed
Methodology Proponent Nippon Koei Co., Ltd.
Proposed Methodology
Public inputs
  • 07 Jun 22   -  21 Jun 22