Decision by the Joint Committee (Electronic Decision) |
04 Jan 23 |
Approval of a proposed methodology
|
|
BD_AM004 "Installation of energy-saving conductors for transmission lines in the Bangladesh grid"
|
|
5th Joint Committee |
28 Mar 22 |
Meeting Report
|
|
Designation of a TPE based on their new accreditation under the ISO 14065:
|
|
- Lloyd’s Register Quality Assurance Limited
|
|
Decision on interim special measure for on-site assessment by TPEs
|
|
Decision on issuance of credits
|
|
- BD002 "Installation of High Efficiency Centrifugal Chiller for Air Conditioning System in Clothing Tag Factory in Bangladesh" for the monitoring period of 01 Mar 17 - 31 Jul 19
|
|
- BD004 "Introduction of PV-diesel Hybrid System at Fastening Manufacturing Plant" for the monitoring period of 01 Jun 16 - 31 Jul 19
|
|
Decision by the Joint Committee (Electronic Decision) |
04 Apr 19 |
Registration of proposed JCM projects:
|
|
- BD003 "Installation of High Efficiency Loom at Weaving Factory"
|
|
- BD004 "Introduction of PV-diesel Hybrid System at Fastening Manufacturing Plant"
|
|
Designation of a TPE for an additional sectoral scope of 12 for validation and verification:
|
|
- EPIC Sustainability Services Private Limited (EPIC)
|
|
Decision by the Joint Committee |
04 Jun 18 |
Rules of Implementation for the Joint Crediting Mechanism (JCM) (version 03.0)
|
|
Rules of Procedures for the Joint Committee (version 03.0)
|
|
Decision by the Joint Committee (Electronic Decision) |
15 Mar 18 |
Approval of a proposed revised methodology
|
|
BD_AM001 (ver02.0) "Energy Saving by Introduction of High Efficiency Centrifugal Chiller"
|
|
4th Joint Committee in Tokyo |
10 Jan 18 |
Meeting Report
|
|
Annex 1: JCM Guidelines for Developing Project Design Document and Monitoring Report (version 03.0)
|
|
Annex 2: JCM Verification Report Form (version 02.0)
|
|
Annex 3: JCM Credits Issuance Request Form (version 02.0)
|
|
Annex 4: JCM Project Cycle Procedure (version 03.0)
|
|
Registration of a proposed JCM project:
|
|
- BD002 “Installation of High Efficiency Centrifugal Chiller for Air Conditioning System in Clothing Tag Factory in Bangladesh”
|
|
Designation of a TPE for additional sectoral scopes of 1, 2 and 3 for verification
|
|
- Japan Management Association
|
|
Decision by the Joint Committee (Electronic Decision) |
16 Oct 17 |
Approval of proposed methodologies with revisions:
|
|
BD_AM002 "Installation of Solar PV System"
|
|
BD_AM003 "Energy efficiency improvement through the introduction of energy efficient air jet looms in textile industry"
|
|
3rd Joint Committee in Dhaka |
09 Mar 16 |
Meeting Report
|
|
Annex 1 Rules of Procedures for the Joint Committee (version 02.0)
|
|
Annex 2 Rules of Implementation for the Joint Crediting Mechanism (JCM) (version02.0)
|
|
Annex 3 JCM Project Cycle Procedure (version 02.0)
|
|
Annex 3.1 JCM Modalities of Communication Statement Form
|
|
Annex 3.2 JCM Validation Report Form
|
|
Annex 3.3 JCM Project Registration Request Form
|
|
Annex 3.4 JCM Verification Report Form
|
|
Annex 3.5 JCM Credits Issuance Request Form
|
|
Annex 3.6 JCM Approved Methodology Revision Request Form
|
|
Annex 3.7 JCM Post-Registration Changes Request Form
|
|
Annex 3.8 JCM Project Withdrawal Request Form
|
|
Annex 3.9 JCM Registration Request Withdrawal Form
|
|
Annex 3.10 JCM Issuance Request Withdrawal Form
|
|
Annex 4 JCM Guidelines for Developing Proposed Methodology (version 02.0)
|
|
Annex 5 JCM Guidelines for Developing Project Design Document and Monitoring Report (version 02.0)
|
|
Annex 6 JCM Guidelines for Designation as a Third-Party Entity (version 02.0)
|
|
Annex 7 JCM Guidelines for Validation and Verification (version 02.0)
|
|
Annex 8 JCM Glossary of Terms (version 02.0)
|
|
Annex 9 Common Specifications of the JCM Registry
|
|
Annex 10 BD_AM001 “Energy Saving by Introduction of High Efficiency Centrifugal Chiller”
|
|
Designation of third-party entities:
|
|
- Lloyd’s Register Quality Assurance Limited
|
|
- Japan Quality Assurance Organization
|
|
- Japan Management Association
|
|
- TÜV SÜD South Asia Private Limited
|
|
- TÜV Rheinland (China) Ltd.
|
|
- EPIC Sustainability Services Pvt. Ltd.
|
|
- KBS Certification Services Pvt. Ltd.
|
|
2nd Joint Committee in Tokyo |
14 Jan 14 |
Meeting Report
|
|
Annex 1: Bilateral Offset Credit Mechanism Guidelines for Designation as a Third-Party Entity (version 01.0)
|
|
Annex 2: Bilateral Offset Credit Mechanism Guidelines for Validation and Verification (version 01.0)
|
|
Annex 3: Bilateral Offset Credit Mechanism Glossary of Terms (version 01.0)
|
|
1st Joint Committee in Dhaka |
29 Jul 13 |
Annex 1: Bilateral Offset Credit Mechanism Rules of Procedures for the Joint Committee
|
|
Annex 2: Rules of Implementation for the BOCM
|
|
Annex 3: BOCM Project Cycle Procedure
|
|
Annex 4: BOCM Guidelines for Developing Proposed Methodology
|
|
Annex 5: BOCM Guidelines for Developing Project Design Document and Monitoring Report
|
|
Meeting Report
|
|