Project : TH010 Introduction of 3.4 MW Rooftop Solar Power System in Technical Center and Office Buildings

Project title Introduction of 3.4 MW Rooftop Solar Power System in Technical Center and Office Buildings
Ref No. TH010
PDD form
Monitoring plan
Name of project participants (Thailand) Toyota Daihatsu Engineering & Manufacturing Co., Ltd.
Name of project participants (Japan) Toyota Motor Corporation
Name of third party entity (TPE) TPE-TH-005 EPIC Sustainability Services Private Limited (EPIC)
Location of project Country: The Kingdom of Thailand
Region/State/Province etc: (1) Samutprakarn Province; (2) Chacheongsao Province
City/Town/Community etc: (1) 99 Moo 5 Ban-Ragad, Bang-Bo; (2) 99 Moo 2 Ladkwang, Banpho
Latitude, longitude:

(1) Latitude: 13°35'45.2"N / Longitude: 100°52'37.2"E; (2) Latitude: 13°37'27.8"N / Longitude: 101°00'51.7"E

Duration Starting date of project operation: 27 Dec 19
Expected operational lifetime of project: 15 years
Methodology No.
Emission Reductions (tCO2e) Estimated emission reductions in each year
  • - (in 2013)
  • - (in 2014)
  • - (in 2015)
  • - (in 2016)
  • - (in 2017)
  • - (in 2018)
  • - (in 2019)
  • 1,616 (in 2020)
  • 1,616 (in 2021)
  • 1,616 (in 2022)
  • 1,616 (in 2023)
  • 1,616 (in 2024)
  • 1,616 (in 2025)
  • 1,616 (in 2026)
  • 1,616 (in 2027)
  • 1,616 (in 2028)
  • 1,616 (in 2029)
  • 1,616 (in 2030)
Status Request for Registration withdrawn
Public comments
  • 26 Nov 19  -  25 Dec 19
Registration withdrawal
  • Reception date of registration withdrawal: 04 Aug 21