News :
Call for public comments on a proposed JCM project (Thailand) "Introduction of High-efficiency Boiler System to Rubber Belt Plant" (26 November to 25 December 2021)

26 Nov 21

Call for public comments on a proposed JCM project (Thailand) “Introduction of High-efficiency Boiler System to Rubber Belt Plant” (26 November to 25 December 2021)

The draft PDD was submitted to the JCM secretariat between Thailand and Japan on 19 November 2021.
The secretariat makes the draft PDD publicly available for public comments in line with subsection 1.6.1. of the Joint Crediting Mechanism Project Cycle Procedure.

Information on the proposed project (TH018)

All stakeholders are invited to provide their comments on the proposed project to the following email address th-pdd-pi@jcm.go.jp only in English, including the following information:
- Name:
- Affiliated Organization:
- E-mail:
- Country:
- Part of the document (A/B/C/etc):
- Page of the document:
- Comment on the page:

*NOTE: The secretariat makes all received comments publicly available unless the TPE determines that the comment is unauthentic in line with paragraph 42 of the Joint Crediting Mechanism Project Cycle Procedure.

This call for public comments is open from 26 November to 25 December 2021 (24:00 GMT).